- Home
- Building Material
- Cement
- JK Cements resumes production at karnataka facility
Share
JK Cements resumes production at karnataka facility
01 Mar 2016
1 Min Read
Editorial Team
JK Cements has resumed production at its 3 mtpa Karnataka facility, which was temporarily stopped following the caving in of the silo roof. As reported, production of clinker and cement has resumed with operation of the kiln by making an alternate arrangement using two RBC belts for feeding the clinker directly to the cement mill. Restoration of clinker silo is expected to take six months time.
CONTACT: JK Cements.
TEL: 0512-237 1478.
WEBSITE: www.jkcement.com
CONTACT: JK Cements.
TEL: 0512-237 1478.
WEBSITE: www.jkcement.com
JK Cements has resumed production at its 3 mtpa Karnataka facility, which was temporarily stopped following the caving in of the silo roof. As reported, production of clinker and cement has resumed with operation of the kiln by making an alternate arrangement using two RBC belts for feeding the clinker directly to the cement mill. Restoration of clinker silo is expected to take six months time. CONTACT: JK Cements. TEL: 0512-237 1478. WEBSITE: www.jkcement.com
Related Stories
Gold Stories
02 Nov 2023