JK Cements resumes production at karnataka facility
Cement

JK Cements resumes production at karnataka facility

JK Cements has resumed production at its 3 mtpa Karnataka facility, which was temporarily stopped following the caving in of the silo roof. As reported, production of clinker and cement has resumed with operation of the kiln by making an alternate arrangement using two RBC belts for feeding the clinker directly to the cement mill. Restoration of clinker silo is expected to take six months time.
CONTACT: JK Cements.
TEL: 0512-237 1478.
WEBSITE: www.jkcement.com

JK Cements has resumed production at its 3 mtpa Karnataka facility, which was temporarily stopped following the caving in of the silo roof. As reported, production of clinker and cement has resumed with operation of the kiln by making an alternate arrangement using two RBC belts for feeding the clinker directly to the cement mill. Restoration of clinker silo is expected to take six months time. CONTACT: JK Cements. TEL: 0512-237 1478. WEBSITE: www.jkcement.com

Related Stories

Gold Stories

Hi There!

Now get regular updates from CW Magazine on WhatsApp!

Click on link below, message us with a simple hi, and SAVE our number

You will have subscribed to our Construction News on Whatsapp! Enjoy

+91 81086 03000

Join us Telegram