Share
Linden Comansa tower cranes for Corgo Viaduct
01 Apr 2012
1 Min Read
CW Staff
CAET XXI, a consortium of Soares da Costa, RRC (Ramalho Rosa Cobetar) and the Spanish FCC, is presently building a viaduct over the Corgo river in Vila Real, with the collaboration of two Linden Comansa tower cranes hired to Ibergru.
The viaduct’s pillars number 18 and 19 are being built by two Linden Comansa Flat-Top tower cranes, model 21 LC 400, with maximum load capacity of 18 tonne (39,680 lbs) and erected with jib lengths of 70 m (229 ft), allowing them to load up to 5,000 kg (11,020 lbs) at the jib-end.
Contact: Linden Comansa.
Tel: +34 948 335 020.
Fax: +34 948 330 810.
E-mail: info@comansa.com
Website: www.comansa.com
The viaduct’s pillars number 18 and 19 are being built by two Linden Comansa Flat-Top tower cranes, model 21 LC 400, with maximum load capacity of 18 tonne (39,680 lbs) and erected with jib lengths of 70 m (229 ft), allowing them to load up to 5,000 kg (11,020 lbs) at the jib-end.
Contact: Linden Comansa.
Tel: +34 948 335 020.
Fax: +34 948 330 810.
E-mail: info@comansa.com
Website: www.comansa.com
CAET XXI, a consortium of Soares da Costa, RRC (Ramalho Rosa Cobetar) and the Spanish FCC, is presently building a viaduct over the Corgo river in Vila Real, with the collaboration of two Linden Comansa tower cranes hired to Ibergru. The viaduct’s pillars number 18 and 19 are being built by two Linden Comansa Flat-Top tower cranes, model 21 LC 400, with maximum load capacity of 18 tonne (39,680 lbs) and erected with jib lengths of 70 m (229 ft), allowing them to load up to 5,000 kg (11,020 lbs) at the jib-end.Contact: Linden Comansa.Tel: +34 948 335 020. Fax: +34 948 330 810.E-mail: info@comansa.comWebsite: www.comansa.com
Related Stories
Gold Stories
Opinion Poll
Question : What are you most interested in Construction Technology?
Live Results :
Project Management Software
BIM
Data Analytics and Dashboard Tools
Drones
Land Management Tools
AI & 3D Printing
Latest updates
28 Mar 2024
28 Mar 2024
28 Mar 2024