- Home
- Real Estate
- Linden Comansas new construct
Share
Linden Comansas new construct
01 Aug 2013
1 Min Read
Editorial Team
Energias de Portugal (EDP), the largest electric utility company in the European country, is building the Baixo Sabor hydroelectric plant. The main plant, located upstream of the Sabor river, is a double-curvature dam and will have a height of 123 m with a width of 505 m. Linden Comansa's official distributor in Portugal, IBERGRU, has supplied to the jobsite 15 flat-top tower cranes from the Spanish manufacturer, with maximum load in a range between 5 to 48 tonne.
Contact: Energias de Portugal.
Tel: +351 21 001 2500.
Website: www.edp.pt
Energias de Portugal (EDP), the largest electric utility company in the European country, is building the Baixo Sabor hydroelectric plant. The main plant, located upstream of the Sabor river, is a double-curvature dam and will have a height of 123 m with a width of 505 m. Linden Comansa's official distributor in Portugal, IBERGRU, has supplied to the jobsite 15 flat-top tower cranes from the Spanish manufacturer, with maximum load in a range between 5 to 48 tonne. Contact: Energias de Portugal. Tel: +351 21 001 2500. Website: www.edp.pt
Related Stories
Gold Stories
Opinion Poll
Question : What are you most interested in Construction Technology?
Live Results :
Project Management Software
BIM
Data Analytics and Dashboard Tools
Drones
Land Management Tools
AI & 3D Printing
Latest updates
19 Apr 2024