Linden Comansas new construct
Real Estate

Linden Comansas new construct

Energias de Portugal (EDP), the largest electric utility company in the European country, is building the Baixo Sabor hydroelectric plant. The main plant, located upstream of the Sabor river, is a double-curvature dam and will have a height of 123 m with a width of 505 m. Linden Comansa's official distributor in Portugal, IBERGRU, has supplied to the jobsite 15 flat-top tower cranes from the Spanish manufacturer, with maximum load in a range between 5 to 48 tonne.

Contact: Energias de Portugal.
Tel: +351 21 001 2500.
Website: www.edp.pt

Energias de Portugal (EDP), the largest electric utility company in the European country, is building the Baixo Sabor hydroelectric plant. The main plant, located upstream of the Sabor river, is a double-curvature dam and will have a height of 123 m with a width of 505 m. Linden Comansa's official distributor in Portugal, IBERGRU, has supplied to the jobsite 15 flat-top tower cranes from the Spanish manufacturer, with maximum load in a range between 5 to 48 tonne. Contact: Energias de Portugal. Tel: +351 21 001 2500. Website: www.edp.pt

Related Stories

Gold Stories

Hi There!

Now get regular updates from CW Magazine on WhatsApp!

Click on link below, message us with a simple hi, and SAVE our number

You will have subscribed to our Construction News on Whatsapp! Enjoy

+91 81086 03000

Join us Telegram