MMRDA plans elevated road on Thane-Belapur stretch
ROADS & HIGHWAYS

MMRDA plans elevated road on Thane-Belapur stretch

After four years, motorists will not have to take a detour via Mhape to go from Thane to Shil Phata as an elevated road is likely to be ready by then cutting down the travelling distance. There are plans with the Mumbai Metropolitan Region Development Authority (MMRDA) to erect an elevated road or a flyover (918 m) and have a tunnel (1.7 km) to reduce the overall distance needed to travel between Thane-Shil Phata (on NH-4). As per reports, the three lanes (each direction) bridge will be constructed between Bharat Bijlee and Siemens Factory parallel to Airoli railway station.

After four years, motorists will not have to take a detour via Mhape to go from Thane to Shil Phata as an elevated road is likely to be ready by then cutting down the travelling distance. There are plans with the Mumbai Metropolitan Region Development Authority (MMRDA) to erect an elevated road or a flyover (918 m) and have a tunnel (1.7 km) to reduce the overall distance needed to travel between Thane-Shil Phata (on NH-4). As per reports, the three lanes (each direction) bridge will be constructed between Bharat Bijlee and Siemens Factory parallel to Airoli railway station.

Related Stories

Gold Stories

Hi There!

Now get regular updates from CW Magazine on WhatsApp!

Click on link below, message us with a simple hi, and SAVE our number

You will have subscribed to our Construction News on Whatsapp! Enjoy

+91 81086 03000

Join us Telegram