PASCHAL needed twice for the B34 bypass

01 Sep 2021

PASCHAL supported Schleith GmbH Baugesellschaft, with complete services and systems for engineering Structures 4 and 5 on the new 2.132-km-long road of the B34 bypass, which is part of the German Federal Transport Infrastructure Plan 2030. Schleith GmbH used PASCHAL's wall formwork LOGO.alu to form and set up the in-situ concrete structures, abutments and wing walls. For Structure 5, 

a bridge for agriculture, the PASCHAL complete package included the formwork planning, the formwork, scaffolding and shoring components, the special timber formwork panels and PASCHAL Maturix, the concrete monitoring system from PASCHAL.

Contact: PASCHAL-Werk G. 

Maier GmbH.

Website: www.paschal.com