Practical increase in efficiency with the Paschal LOGO.3

01 Jul 2020

Thanks to the well-balanced range of panels and the stable construction of Paschal’s LOGO.3 formwork, there are many practical ways of significantly reducing the number of tie points so that installing the LOGO.3 system is even more efficient without compromising in terms of safety. The LOGO.3 wall formwork system is designed to withstand a high maximum fresh concrete pressure of 70 kN per sq m with just 0.62 ties per sq m. 

Contact: Katja Münch, Head of Marketing, PASCHAL-Werk G. Maier GmbH.

Address: Kreuzbühlstraße 5, D-77790 Steinach.

Tel: +49 7832 71-237.

E-mail: katja.muench@paschal.de

Website: www.paschal.com

Related Stories