Mechanical separator to be set up near Phagwara

01 Jul 2022

Mechanical Separator to be installed at the garbage dump near Palahi village in Phagwara, and its infrastructure has been constructed.
After installing the separator, old waste dumped at the site for over 18 years, including scrap items, compostable waste, etc., would be separated for proper disposal and reduce the waste heaps. There are around 14 lakh metric tonnes (MT) of waste, of which 4 lakh MT would be separated by the machine and properly disposed of in 1.5 years. Regular spraying is also being arranged near the garbage dumping area to control the stink. A tubewell is being installed at the garbage dump to ensure daily water spraying to prevent fire.

Related Stories