Indian Railways creates a record

01 Aug 2018

Indian Railways has constructed a subway crossing in just four-and-a-half-hours between Pendurthi and Kottavalasa line in Andhra Pradesh. The limited height subway, which was constructed a few months back, has created a record. The level crossing between Kottavalasa and Pendurthi is a four-track manned level crossing. The limited height subway work, which was done a few months back, consists of 20 segments of 1.5 m widths while the size of the box is 4.65 m x 3.65 m.

Contact: Indian Railways.

Website: www.indianrailways.gov.in

Related Stories