Mumbai Monorail To Resume With New CBTC Trains
RAILWAYS & METRO RAIL

Mumbai Monorail To Resume With New CBTC Trains

Mumbai's Monorail will resume passenger services after a modernisation that includes an upgraded Communication-Based Train Control signalling system and a new fleet of Made in India trains. The Commissioner of Metro Rail Safety granted final statutory clearance and the Mumbai Metropolitan Region Development Authority obtained state approvals to restart operations. The move is intended to improve reliability and Metro connectivity.

MMRDA indicates operational losses are likely to continue because the corridor's permitted passenger capacity remains constrained. Annual losses are estimated to fall from nearly Rs 1.8 billion (bn) to around Rs 1.2 bn after modernisation, reflecting energy savings and improved systems but not restoring profitability. The authority cites regenerative braking and other efficiencies for the reduced costs.

The upgrade includes the induction of 10 new monorail rakes and retrofitting of the existing fleet with CBTC technology to enable continuous communication, reduced headway and improved scheduling. The signalling changes are expected to increase service frequency and enhance operational safety ahead of the restart.

The monorail's single elevated guideway limits passenger numbers and staff will manage station entry to prevent overcrowding, so commuters may need to wait for later services when capacity is reached. The measure follows earlier disruptions from sudden demand surges and standard operating procedures have been revised to support crowd management.

The 19.54 km corridor between Sant Ghadge Maharaj Chowk in Mahalaxmi and Chembur was built at a cost of about Rs 24.6 bn and comprises 17 stations. MMRDA is constructing a foot overbridge with travelators to link V.N. Purav Chowk Monorail station with the upcoming Metro Line 2B Chembur station, about 50 metres away. The authority has appointed Power Mech Projects to operate and maintain the network for five years and expects the upgrades and Metro integration to improve commuter convenience, while acknowledging the system is unlikely to become financially self sustaining.

"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

Mumbai's Monorail will resume passenger services after a modernisation that includes an upgraded Communication-Based Train Control signalling system and a new fleet of Made in India trains. The Commissioner of Metro Rail Safety granted final statutory clearance and the Mumbai Metropolitan Region Development Authority obtained state approvals to restart operations. The move is intended to improve reliability and Metro connectivity. MMRDA indicates operational losses are likely to continue because the corridor's permitted passenger capacity remains constrained. Annual losses are estimated to fall from nearly Rs 1.8 billion (bn) to around Rs 1.2 bn after modernisation, reflecting energy savings and improved systems but not restoring profitability. The authority cites regenerative braking and other efficiencies for the reduced costs. The upgrade includes the induction of 10 new monorail rakes and retrofitting of the existing fleet with CBTC technology to enable continuous communication, reduced headway and improved scheduling. The signalling changes are expected to increase service frequency and enhance operational safety ahead of the restart. The monorail's single elevated guideway limits passenger numbers and staff will manage station entry to prevent overcrowding, so commuters may need to wait for later services when capacity is reached. The measure follows earlier disruptions from sudden demand surges and standard operating procedures have been revised to support crowd management. The 19.54 km corridor between Sant Ghadge Maharaj Chowk in Mahalaxmi and Chembur was built at a cost of about Rs 24.6 bn and comprises 17 stations. MMRDA is constructing a foot overbridge with travelators to link V.N. Purav Chowk Monorail station with the upcoming Metro Line 2B Chembur station, about 50 metres away. The authority has appointed Power Mech Projects to operate and maintain the network for five years and expects the upgrades and Metro integration to improve commuter convenience, while acknowledging the system is unlikely to become financially self sustaining.

Next Story
Infrastructure Transport

Uttar Pradesh unveils infrastructure-led growth roadmap at RAHSTA

Mumbai, 9 July 2026: Uttar Pradesh’s ambitious infrastructure-led growth strategy took centre stage on Day 2 of the 16th RAHSTA Expo, where senior government officials outlined how expressways, industrial corridors and technology-driven governance are transforming the state into one of India's most attractive investment destinations.Delivering the keynote address, Srihari Pratap Shahi, IAS, Additional Chief Executive Officer, Uttar Pradesh Expressways Industrial Development Authority (UPEIDA), highlighted the state's long-term vision of integrating world-class expressways with industrial dev..

Next Story
Real Estate

NCW closes PRIME Offices Fund at Rs 40 billion

Nuvama and Cushman & Wakefield Management (NCW) has announced the final close of its flagship PRIME Offices Fund at approximately Rs 40 billion, exceeding its original target of Rs 30 billion following strong investor demand.The fund was launched to provide Indian investors with access to institutional-grade commercial office assets across key office markets in the country. According to NCW, the increase in the fund size was supported by strong investor participation and the availability of investment opportunities in India's office sector.The fund has already committed around 45 per cent ..

Next Story
Real Estate

Mayfair Housing adopts Autodesk Forma for digital project planning

Mayfair Housing has entered into a three-year strategic partnership with Autodesk to deploy Autodesk Forma, an AI-enabled cloud platform, as part of its digital transformation programme aimed at improving project planning and execution across its development and redevelopment portfolio.The platform will be integrated into the company's Building Information Modelling (BIM) workflow to support architects, planners and project teams during the early stages of design and development. Autodesk Forma combines real-world data, environmental simulations and collaborative workflows to facilitate data-d..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement