Upcoming Projects

SL No. Company Project Details Budget
(in ₹ millon)
Contacts Type

Airport / Aviation

1 Airport Authority of India (AAI) The airport development authority has received a fresh proposal by the district administration to set up an airport at Dhalbhumgarh in Ghatshila sub-division of Jharkhan. Around 240 acre will be provided by the district administration. 0 KK Pandey, ATS Incharge, Jamshedpur Airport, Post Office Sonari, East Singhbhum District-831 011, Jharkhand. Tel: 0657-664 3582. Mobile: (0) 80920 89525. E-mail: kk.pandey@tatasteel.com Conceptual
2 Airports Authority of India (AAI) The authority plans to undertake the development of Tuticorin Airport. The work is likely to commence by April 2019 and the completion is targetted by 2022. Around 410 of land out of 601 required is already handed over to the authority by the Tamil Nadu Government. 5,000 N Subramanian, Airport Director, AAI, Thoothukudi-628 001, Tamil Nadu. Tel: 0461-227 1863. E-mail: apd-tuticorin@aai.aero Conceptual
3 Airports Authority of India (AAI) AAI plans to develop a greenfield airport at Hollongi near Itanagar Arunachal Pradesh. The airport will have a 2,200-m runway. The Centre has approved the project and the work is likely to start in April 2019. It is targetted to be completed in 3-4 years. 10,430 1) SK Jain, GM Engineering, LGB International Airport, Guwahati-781 015, Assam. Tel: 0361-284 0223, 284 2315. E-mail: gmenggner@aai.aero, redner@aai.aero 2) Chandrashekhar, ED (NER), Rajiv Gandhi Bhawan, Safdarjung Airport, New Delhi-110 003. Tel: 011-2463 2950. Conceptual/Planning Stage
4 Bengaluru International Airport (BIAL) The airport operator plans to develop the Kempegowda International Airport in Bengaluru by constructing a new terminal, a second runway and by expanding its access roads. The second runway will be operational by October, while the new terminal will be ready in 2021 as part of Phase-I. 1,30,000 Archana Muthappa, GM & Head (Corp Comm), Administration Block, Devanahalli - 560300, Bengaluru, Karnataka. T: 080-66782045, 66782425, archana@bialairport.com, (Bhaskar Anand Rao, CFO) Under Implementation

Housing

12 Agra Municipal Corporation (AMC) AMC plans to implement the development of 19 slum localities in Agra district of Uttar Pradesh. The state government has approved Rs 200 mn in this regard. District Urban Development Authority (DUDA) will develop the infrastructure including roads and upgrade drainage system. 0 Tarun Kumar Sharma, Chief Engineer (Civil), Near Sur Sadan, MG Road, Agra, Uttar Pradesh. Mobile: (0) 73007 40603. E-mail: amcagra1@gmail.com Conceptual/Planning Stage

Metro-Rail

14 Mumbai Metro Rail Corporation (MMRC) The MMRC has recently awarded the contract for Automatic Fare Collection (AFC) for Metro 3 Colaba-Bandra-SEEPZ corridor in Mumbai to Consortium of ASIS Elektronik be Billisim Sistemleri AS, Turkey and Kalindee Rail Nirman a Div of Texmaco Rail and Engineering (Kalindi-ASIS JV). The work consists of design, manufacture, supply, installation, testing and commissioning of the system at all 27 stations of the corridor. As of now, around 35 per cent of the work is over, and 17 km out of 52 km tunnel is completed. The completion is targetted by 2020. 2,31,360 Vaidehi More, AGM (PR), NaMTTRI Building, Plot No R-13, E-Block, BKC, Bandra (East), Mumbai-400 051, Maharashtra. Tel: 022-2638 4633. E-mail: vaidehi.more@mmrcl.com Under Implementation
15 MMRDA The civil construction of the 18.9-km-long Metro Line 7 is divided into three packages. Simplex Infrastructure is undertaking the Package I, consisting of Andheri (East), Shankarwadi, JVLR Junction and Mahananda stations. J. Kumar Infraprojects is implementing Package II from Aarey, Pathanwadi, Pushpa Park, Bandongari to Mahindra and Mahindra stations. NCC Ltd is the contractor for Package III, which consists of Magathane, Devipada, National Park and Ovripada stations. The civil works construction contract will now be extended for another seven months. 0 Tanaji Bhosle, Chief Engineer (Civil), 6th Floor, B Wing, Old MMRDA Building, Bandra (East), Mumbai - 400051, MH. T: 022-26594154, M: 8130330404, tanaji.bhosle@mailmmrda.maharashtra.gov.in, (R. A. Rajeev, IAS, Metropolitan Commissioner, T: 022-26591234) Under Implementation

Cement

5 Sanghi Industries Ltd The company has decided to double up the production capacity of its cement plant at Sanghipuram in Kutch from 4 mn to 8.6 mn. The expansion will start in quarter of 2019 and complete by 2020. The MOU was recently signed with the Gujarat Government in this regard. 15,000 Nimesh Patel, Asst General Manager, 10th Floor, Kataria Arcade, Off SG Highway, Ahmedabad District-380 051, Gujarat. Tel: 079-2683 8000. Mobile: (0) 99099 53303. E-mail: nimesh.patel@sanghicement.com Conceptual/Planning Stage
6 ACC The company plans to build a new cement plant at Ametha, Katnl district of Madhya Pradesh. The unit will have a clinker production capacity of 3 mt per year and a cement production capacity of 1 mt per year. 0 Michelle D'Souza, Sr Vice President and Head of Corp Comm, Cement House, 121, Maharshi Karve Road, Mumbai-400 020, Maharashtra. Tel: 022-3302 4321, 6665 4321. E-mail: Michelle.DSouza@acclimited.com, corporate.communications@acclimited.com Conceptual

Ports and Shipping

16 GMR Kakinada Gateway Port The GMR Group company is setting up a greenfield commercial port near Kakinada in Andhra Pradesh. The completion is targetted in three years. 0 Nagarjuna Tadury, Director, 4th Floor, GMR Aero Towers, Rajiv Gandhi International Airport, Shamshabad, Hyderabad-500 108, Telangana. Tel: 040-6739 4020. E-mail: nagarjuna.tadury@gmrgroup.in Under Implementation
17 Bengal Ports Bengal Ports plans to set up Kulpi Port project in the South 24 Parganas district of West Bengal. The port would be built in a PPP mode. Dubai-based DP World, Bengal Ports and the West Bengal Industrial Development Corporation are the stakeholders of the project in the 44.5: 44.5:11 ratio. 0 Rizwan Sultanali Soomar, CEO & MD, Sagar Estate, 4th Floor, 2 Clive Ghat Street, Kolkata-700 001, West Bengal. E-mail: secretarial@dpworld.com Conceptual/Planning Stage

Power

18 Goa Electricity Department The department is undertaking the underground cabling project for Porvorim constituency in Goa. The project is implemented in two phases. Phase-I costing Rs 380 mn is in progress. 930 Pradip Narvekar, Executive Engineer, Electricity Department, 3rd Floor, Anasa Bhad, Mhapsa, Bardez-403 507, Goa. Mobile: (0) 83800 15006. E-mail: pradip.n@goaelectricity.gov.in Conceptual

Real Estate

19 Gaurs Group Gaurs Group plans to develop a new housing project named KrishnVilas on the Yamuna Expressway at Greater Noida, Uttar Pradesh. The project comprises the construction of 410 independent villas in the 25-acre project. 5,000 Gaur Biz Park, Plot No-1, Abhay Khand II, Indirapuram, Ghaziabad-201 014, Uttar Pradesh. Tel: 120-434 3333. Mobile: (0) 955580 2222. Conceptual/Planning Stage

Roads/Highways/Bridges

20 Ahmedabad Urban Development Authority (Auda) The authority has proposed an underbridge at the junction connecting Bopal South to the Karnavati Club Road in Gujarat. The work is expected to be completed in two years. 660 Pathak Atul, Executive Engineer, Sardar Vallabhbhai Patel Bhavan, Usmanpura, Ashram Road, Ahmedabad-380 014, Gujarat. Tel: 079-2754 5055, 2754 5051. Mobile: (0) 9825300337. E-mail: exn.auda@gmail.com, auda_urban@yahoo.co.in Conceptual
21 Ahmedabad Urban Development Authority (Auda) The authority is constructing a flyover at Shantipura Crossroads on the SP Ring Road in Ahmedabad, Gujarat. The completion is targetted in 24 months, and Rachana Construction is the contractor. 940 Pathak Atul, Executive Engineer, Sardar Vallabhbhai Patel Bhavan, Usmanpura, Ashram Road, Ahmedabad-380 014, Gujarat. Tel: 079-2754 5055, 2754 5051. Mobile: (0) 9825300337. E-mail: exn.auda@gmail.com, auda_urban@yahoo.co.in Under Implementation
22 Haryana Public Works Department The department is implementing the road improvement project by providing four-laning on Nizampur Nangal Chaudhary road in Mohindergarh district of Haryana, including Nizampur to Ghatasher approach road and Ghatasher to the hub. The completion is targetted in 12 months. 468.8 Rajeev Aggarwal, Superintending Engineer, Rewari Circle, PWD (B&R), Rewari, Haryana. Tel: 01274-256 936. Mobile: (0) 09418019509. Under Implementation
23 Bruhat Bengaluru Mahanagara Palike Plans are to assign the white topping on selected roads in Bengaluru city, under Phase 2. Bids are currently called for Package 7 and 8. The work is likely to start soon. 494.2 Aghalaya Ramesh, Executive Engineer (Project Central-2 ), Ground Floor, Annexe-2 Building, NR Square, Bengaluru-560 002. Mobile: (0) 9480683985. E-mail: eeprojectscentral2@gmail.com Conceptual/Planning Stage
24 National Highways Authority of India The authority is implementing the six-laning of Bangalore-Nidagatta Section in Karnataka. Dilip Buildcon is the contractor. The completion is targetted by 2020. 34,473.30 DO Tawade, Member (Technical), G-5 and 6, Sector 10, Dwarka, New Delhi-110 075. Tel: 011-2507 4100, 2507 4200. Under Implementation
25 National Highways Authority of India The authority is implementing the six-laning of Nidagatta-Mysore Section in Mysore, for which Dilip Buildcon is the contractor. The completion is targetted in 2020. 27,654.30 DO Tawade, Member (Technical), G-5 and 6, Sector 10, Dwarka, New Delhi-110 075. Tel: 011-2507 4100, 2507 4200. Under Implementation
26 National Highways Authority of India Plans are to assign the construction of four-laning of Nanasa to Pidgaon from Section of NH-47 in Nanasa, Madhya Pradesh, under Bharatmala Pariyojna Phase-I on EPC mode. The work will start by May 2019 and is expected to be completed in 24 months. 5979.1 KV Singh, GM (Tech), G-5 and 6, Sector 10, Dwarka, New Delhi-110 075. Tel: 011-2507 4100/200. Conceptual/Planning Stage
27 Pimpri Chinchwad Municipal Corporation (PCMC) The corporation has proposed the construction and development of roads at Adarsh Nagar in Prabhag No 03, Pimpri Chinchwad, Maharashtra. The work is likely to start soon and is expected to be completed in 18 months. 121.6 BP Supekar, Executive Engineer, Mumbai-Pune Road, Pimpri, Pune-411 018, Maharashtra. Tel: 020-2742 5511/12/13/14. Mobile: (0) 99225 01776 Conceptual/Planning Stage
28 Pimpri Chinchwad Municipal Corporation (PCMC) The corporation plans to undertake the construction of the road from Mahabali Chowk to Old RTO office at Prabhag No II in Pune, Maharashtra. The completion is targetted in 12 months. 76.5 Shrikant Sawane, Executive Engineer, BRTS, Mumbai-Pune Road, Pimpri, Pune-411 018, Maharashtra. Tel: 020-2742 5511/12/13/14. Mobile: (0) 99225 01723. Conceptual/Planning Stage
29 Brihanmumbai Municipal Corporation (BMC) The Coastal Road, 29.2 km-long freeway that would run along Mumbai's western coastline connecting Marine Line in south to Kandivali in the north, is under construction. HCC-Hyundai Development had bagged the order for the design and construction of road, bridges, interchanges including reclamation and associated works between Baroda Palace near Haji Ali and the Worli end of Bandra Worli Sea Link. Larsen & Toubro bagged orders for two packages (1 and 4) of Mumbai Coastal Road Project in 2018. The completion of the project is targetted in 2022. 1,20,000 Vijay Zore, Sub Engineer, (Coastal Road), 3rd Floor, Municipal Engineering Hub Building, Dr E Moses Road, Worli, Mumbai-400 018. Tel: 022-2495 8258/66. Mobile: (0) 91679 37206, 98694 43508. E-mail: che.coastalroad@mcgm.gov.in, coastalroadcell.mcgm@gmail.com Under Implementation
30 Government of Odisha The Odisha Government is in plans to assign the construction of minor bridge over local nallah on Khairput to Amakunda Road under SCA for the year 2018-19 in Malkangiri district. The completion is targetted in six months. 4.4 NV Harihar, Executive Engineer, Rural Works Division-I, Malkangiri, Odisha. Tel: 06861-230 409. E-mail: ori-dmalkangiri@nic.in Conceptual/Planning Stage
31 Government of Odisha The Odisha Government is in plans to assign the construction of over local nallah on Korukonda to Kamawada Road under SCA for the year 2018-19 in Malkangiri district. The completion is targetted in four months. 2.6 NV Harihar, Executive Engineer, Rural Works Division-I, Malkangiri, Odisha. Tel: 06861-230 409. E-mail: ori-dmalkangiri@nic.in Conceptual/Planning Stage
32 Department of Highways and Minor Ports of state of Tamil Nadu Chennai Peripheral Ring Road will be connecting Ennore and Katupalli ports in the north with East Coast Road at Mamallapuram covering 133.65 km in Tamil Nadu. The land acquisition process is on. It will take two more years to start work. The completion is targetted by 2023. JICA is funding the project, and the union government has recently signed a Rs 24.70 bn loan agreement with JICA. 0 Rajeev Ranjan, Additional Chief Secretary to Government, Namakkal Kavignar Maaligai, Fort St George, Chennai-600 009, Tamil Nadu. Tel: 044-2567 0959, 2566 5566. E-mail: hwaysec@tn.gov.in 2) P Marimuthurajan, SE, Construction and Maintenance Wing, Madurai Circle, Madurai-625 001, Tamil Nadu. Tel: 04567-226 370. Mobile: (0) 9842134501. Conceptual/Planning Stage
33 National Highways Authority of India NHAI is in plans to assign the improvement and upgradation to two-lanes with paved shoulder and four-lane configuration of NH-321 G Section from Agra to Jalesar in Uttar Pradesh. The completion is targetted in 24 months. 2,129.30 Arun Jagga, General Manager (Tech), Uttar Pradesh West, G-5 and 6, Sector-10, Dwarka, New Delhi-110 075. Tel: 011-2507 4100/200. E-mail: arunjagga@nhai.org Conceptual/Planning Stage
34 New Okhla Industrial Development Authority Plans are in to undertake the construction of an elevated six-lane corridor covering 5.5 km that would start at Delhi's Mayur Vihar and end at Mahamaya flyover on Noida-Greater Noida Expressway in Uttar Pradesh. The work is expected to be completed in 42 months. 6,500 Indra Vikram Singh, ACEO (I), Administrative Complex, Sector 6, District Gautam Budh Nagar, Noida-201 301, Uttar Pradesh. Tel: 0120-242 2704, 242 5025, 242 2348. E-mail: aceoi@noidaauthorityonline.com Conceptual/Planning Stage
35 Ministry of Road Transport and Highways The Char Dham Highway development project covering 719.0 km in Uttarakhand proposes to provide all-weather connectivity to the four holy towns of Kedarnath, Badrinath, Yamunotri and Gangotri. The work is has commenced. The completion deadline is revised from December 2018 to 2020. 1,20,000 Virendra Singh Khaira, Chief Engineer (RO), 46/1, Canal Road, Jakhan, Dehradun-248 001, Uttrakhand. Tel: 0135-273 8657. E-mail: khairavs@gmail.com Conceptual/Planning Stage

Transport

42 Goa State Infrastructure Development Corporation (GSIDC) The corporation is implementing the construction of bus stand at Margao, Goa. The foundation stone was recently laid. 3,500 Venkata Eswar Naidu Vissa, Asst. Manager (Civil), 1st Floor, SPACES Building, Patto Centre, Panaji-403 001, Goa. Tel: 0832-249 3550. Mobile: (0) 77200 46386. E-mail: eswar.vissa@gsidcltd.com Under Implementation
43 Thane Municipal Corporation (TMC) The civic body is in plans to implement the Personal Rapid Transit System (PRTS) or pod cards project in Thane, Maharashtra. The civic body is likely to undertake the economic viability of the project. The project will be executed in multiple phases. The Phase-I would cover the route of 34 km, while the project will have a network of 100 km. Air-cooled pod cards will accommodate 4-6 passengers and run on designated single tracks. 25,000 Mohan Kalal, Executive Engineer, Mahapalika Bhavan Road, Banacha Pada, Ganeshwadi, Thane West, Thane-400602, Maharashtra. Tel: 022-2533 1590. Mobile: (0) 9920335155 Conceptual

Water Sector

44 Municipal Corporation of Greater Mumbai The civic body plans to assign the construction of interconnection by 4,000 mm dia MS pipe from Bhandup Tunnel Shaft to 1910 MLD Old WTP in Bhandup Complex and allied works in Mumbai. The work is likely to start soon and will be completed in 15 months. 178.8 MM Joshi, SE (WSP), MCGM 1st Floor, Engineering Hub Building, Dr E Moses Road, Worli Naka, Worli, Mumbai- 400 018, Maharashtra. Tel: 022-2495 8001, 2495 8101. Mobile: (0) 9819 38972. E-mail: che.wsp@mcgm.gov.in Conceptual/Planning Stage
45 Tiruchirappalli Smart City Plans are in to assign the works of providing barbed wire fencing arrangement, the formation of BT Surface and water supply arrangements to solar power plant site at Panjappur ward No 39 in Tiruchirappalli City Corporation in Tamil Nadu. 10 Sangeetha Priya, Assistant Engineer, Bharathidasan Road, Cantonment, Trichy - 620001, Tamil Nadu. Tel: 0431-241 5393, 241 5394, 241 5395. Mobile: (0) 9094220232. Conceptual/Planning Stage

Construction

7 AP State Police Housing Corporation The company plans to undertake the construction of a building for the establishment of the regional academy for boys with 100 capacity at Kommadi, Visakhapatnam district of Andhra Pradesh. The work is likely to commence soon and will take six months to complete. 14.2 L Sreenivas Reddy, Chief Engineer, Mangalagiri, Andhra Pradesh. Tel: 0863-234 1861. Mobile: (0) 9440700754 Conceptual/Planning Stage
8 National Buildings Construction Corporation The CPSE has signed an MoU with the Department of Industries and Commerce and the Government of Assam for the construction of a twin tower trade at Guwahati in Assam. The work is expected to be completed in 60 months. 19,470 Alok Rastogi, Executive Director (Engg), NBCC Bhawan, Lodhi Road, New Delhi-110 003, Delhi. Tel: 011-2436 7314. E-mail: alok.rastogi@nbccindia.com Under Implementation
9 Municipal Corporation of Gurugram (MCG) The civic body plans to construct a multi-level parking with commercial complex and one multiplex at Kaman Sarai in Gurugram. The work is likely to start soon. 1,500 ND Vashishta, Chief Engineer, 25, Jharsa Road, Opp Civil Hospital, Police Lines, Gurugram-122 007, Haryana. Tel: 0124-237 0911. Mobile: (0) 9711005714. E-mail: ce@mcg.gov.in Conceptual/Planning Stage
10 NTPC The company plans to assign the construction of buildings at NTPC Kudgi in Vijayapura district of Karnataka. 0 DL Uttarkar, AGM (CS), Kudgi Super Thermal Power Project, Basavana Bagewadi, Vijayapura-586 121, Karnataka. Tel: 08426-284 109. E-mail: raousrinivasa@ntpc.co.in, dluttarkar@ntpc.co.in Conceptual/Planning Stage
11 Municipal Corporation of Greater Mumbai The civic body plans to undertake the construction of retaining structure along the approach road of Middle Vaitarna Dam in OC Division of Palghar district, Maharashtra. The tender was re-invited. The completion is targetted in 24 months. 143.4 ND Kulkarni, DY Hydraulic Engineer (Operations), MCGM Water Works Yard, Kapurbawdi, PO Sandoz Baug, Thane (West)-400 607, Maharashtra. Tel: 022-2543 1905/ 2542 1094. Mobile: (0) 9930260547. E-mail: dyheopkap@rediffmail.com Conceptual/Planning Stage

Sewage Treatment

36 Water Security and Public Health Engineering Department, Government of Sikkim Expression of interest is invited for the design, construction and commissioning of 3.25 MLD capacity Sequential Batch Reactors (SBR) type Sewage Treatment Plant and other allied works in the plant complex at Lower Tathangchen, in Sikkim. The work will start in April 2019 and will be completed in a year. 140.1 1) Krishna Chandra Sharma, Chief Engineer, Nirman Bhawan, Gangtok, Sikkim. Mobile: (0) 94340 61727. E-mail: krishnacsharma@yahoo.co.in 2) CK Basnet, Add Chief Engineer, Nirman Bhawan, Gangtok, Sikkim. Mobile: 94347 33555. Conceptual/Planning Stage
37 Uttar Pradesh Jal Nigam Plans are in to assign the design and build sewage treatment plant of capacity 15 mld with open technology and all appurtenant structures and allied works in Kasganj district of Uttar Pradesh. The work is likely to start in June 2019 and will take 24 months to commission. 760 RS Pracheta, General Manager, Yamuna Pollution Control Unit, Water Works Crossing, Jeoni Mandi Road, Agra-282 004, Uttar Pradesh. Tel: 0562-262 1685. Mobile: (0) 99900 85205/94739 42643. E-mail: gmypcuagr@yahoo.com Conceptual/Planning Stage

Solar Power

38 Bihar Renewable Energy Development Agency (BREDA) The agency has issued a request for proposal (RfP) for the installation of 15 MW of grid-connected rooftop solar PV systems. The project will be developed under RESCO model with the net metering facility at various locations across the state. The scope of work includes the design, supply, installation, testing, and commissioning of the project. 900 Surinder Kumar, Project Manager Solar, Vidhyut Bhawan,Building No-2, 2nd Floor, Bailey Road, Patna-800001, Bihar. T: 0612-2507734, M: 7903060462, breda@breda.in, (Alok Kumar, IES, Director) Under Implementation
39 Tiruchirappalli Smart City Plans to assign the design, supply, installation, and commissioning of 2.4 mwp ground-mounted solar power plant at STP Panchappur near Madurai by-pass road. The work will start soon and take 12 months to complete. 125 Sangeetha Priya, Assistant Engineer, Bharathidasan Road, Cantonment, Trichy - 620001, Tamil Nadu. Tel: 0431-241 5393, 241 5394, 241 5395. Mobile: (0) 90942 20232. Conceptual

Sports Infrastructure

40 Municipal Corporation of Greater Mumbai The civic body is in plans to undertake the development of Bhachchubhai playground, CTS No 1437 and Sant Rohidas Garden, CTS No 1/1970 in E ward in Mumbai, Maharashtra. The scope of work involves demolition of the existing south compound wall, construction of south compound wall, construction of entrance gate, horticulture work, construction of the pathway, construction of pipe drain, underground water tank. M & E work, etc. The work will start in February 2019. 28.9 BV Rathod, Executive Engineer (Civil), (Garden Cell), 566, CPD Compound, Bakri Adda, NM Joshi Marg, Byculla (West), Mumbai- 400 011, Maharashtra. Tel: 022-2684 8209. Mobile: (0) 80973 98848. E-mail: mcgmgardencell@gmail.com Conceptual/Planning Stage

Township

41 Visakhapatnam Metropolitan Region Development Authority (VMRDA) Plans to establish a new township spread over 25.9 acres of government land, around 4 km from Rushikonda Beach in Andhra Pradesh on a PPP mode. NA A Srinivas, Secretary, VMRDA, 8th Floor, Udyog Bhavan, Siripuram Jn., Visakhapatnam-530 003, Andhra Pradesh. Tel: 0891-275 4133/34. Mobile: 98663 63000. E-mail: secyvuda@gmail.com Conceptual

IT Park

13 Genpact The company is developing Imagine Tech Park at Salt Lake Sector V in collaboration with Simplex Infra Group in Kolkata. The project comprises construction of G+25 building with a built-up space of 600,000 sq ft. 1,500 NV Tiger Tyagarajan, CEO, Kolkata: Asyst Park, 6th Floor, GN 37/1, Sector V, Salt Lake, Kolkata-700 091, West Bengal. Tel: 033-4002 5700. Under Implementation