H.G. Infra to start South Central Railway project from June 22
H.G. Infra Engineering has announced that the appointed date for its new project with South Central Railway is set for June 22, 2024. This follows a letter received from South Central Railway on June 18, 2024.
The project involves the doubling of the track between Karanjgaon station (Km 69.01) and Aurangabad station (Km 113.15), covering a distance of 44.14 km. It includes electrification and signalling works as part of the Aurangabad-Ankai Doubling Project in the Nanded Division of South Central Railway, to be executed on an Engineering, Procurement, and Construction (EPC) basis. (Source: Business Standard)
Related Stories
H.G. Infra Expands into Battery Storage with Gujarat Win
HGINFRA enters the energy storage sector with a major 300 MW project
H.G. Infra bags 6-lane road contract from NHAI
To construct six-lane Greenfield Varanasi-Ranchi-Kolkata Highway.
Page {{currentPage}} of {{pageCount}}
{{#products}}
{{title}}
{{/products}}
{{copy}}