Kolkata to Add 435 Buses amid Fleet Shortage

West Bengal plans to add 435 buses to the West Bengal Transport Corporation fleet to address shortages in Kolkata and adjoining areas. Electric and compressed natural gas (CNG) vehicles will account for 358 of the proposed additions, according to transport minister Arjun Singh.

The planned fleet comprises 152 air-conditioned electric buses, 206 non-air-conditioned CNG buses, 40 non-air-conditioned diesel midi buses and 37 Volvo coaches, including four sleeper buses. The proposal follows complaints about ageing vehicles, reduced fleet availability and long waits at bus stops.

The electric fleet will include 30 40-seater buses, while the remaining 122 vehicles will be suited to high-demand urban corridors. The CNG component will comprise 30 standard buses, 76 50-seater vehicles and 100 buses measuring 12 metres, with the additions intended to strengthen lower-cost ordinary passenger services.

The proposal also includes 40 diesel midi buses for routes where narrower roads or lower passenger demand make standard-sized vehicles unsuitable. The Volvo fleet will comprise 27 standard 12-metre buses, six 45-seater vehicles and four 40-seater sleeper coaches, although deployment details and specific routes have not been announced.

The planned induction follows the July launch of 50 air-conditioned buses, comprising 43 CNG and seven electric vehicles, across 24 routes. West Bengal has also begun steps to participate in the Centre’s PM-e Bus Sewa programme, which envisages 10,000 electric buses across cities through public-private partnerships. Parliament was informed in March 2026 that 10,000 buses had been sanctioned across 123 cities in 27 states and Union territories, but West Bengal was not listed among recipients as of March 12.

The state’s fleet expansion is separate from the central programme and will require charging facilities, CNG refuelling stations, depot capacity and maintenance arrangements. The transport department has not specified the delivery schedule, route allocation or phased deployment plan, leaving the effect on waiting times dependent on implementation.

Related Stories

Coal India, ReNew Among Four Firms Get Rare-Earth Magnet Scheme LoIs
30 Electric Buses Rolled Out in Vizag as State Targets 750 by December
MoHUA Reviews PM-eBus Sewa Progress and Jammu E-Bus Operations