BHEL Wins Power Grid Order for Synchronous Condensers
The contract covers design, engineering, manufacturing, supply, erection, testing and commissioning of two 300/-200 megavolt-ampere reactive (MVAR) synchronous condensers. The equipment will form part of the transmission system being developed to integrate electricity generated by renewable energy projects in the Jam Khambhaliya renewable energy zone.
Synchronous condensers provide reactive power support and help maintain voltage stability in transmission networks. Their role has become more important as electricity systems accommodate larger volumes of variable generation from solar and wind projects, which do not provide the same inherent grid-stability functions as conventional thermal power stations.
The Jam Khambhaliya zone is one of several locations identified by central and state authorities for large-scale renewable energy development. Its expansion requires additional transmission infrastructure to evacuate electricity from Gujarat to demand centres across the country. Gujarat has significant solar and coastal wind resources, supporting continued investment in generation and associated transmission assets.
BHEL supplies power generation and transmission equipment to public and private utilities, including turbines, generators, transformers and related electrical systems. The company’s order book includes equipment for renewable energy integration alongside its traditional thermal and hydroelectric business. Orders for grid-stability equipment such as synchronous condensers are expected to grow as renewable capacity expands and transmission networks require additional voltage-support capability.