BPCL calls for bids: Green hydrogen project at cochin Airport
The tender explicitly seeks bids for procuring the electrolyser system, ensuring a hydrogen generation capacity at 30 bar pressure with a minimum purity level of 99.998%. The system should be containerised and plug-and-play, encompass rectifiers, transformers, piping, valves, instruments, analysers, electrical systems, and automation employing a programmable logic controller.
Contractors must provide two years' worth of spares and undertake operational and maintenance responsibilities for five years post-commissioning within a delivery period of six months from the issuance of the acceptance letter. Tractebel Engineering Private Ltd will oversee the venture's design, engineering, and project management consultancy. This initiative aligns with recent efforts by the Ministry of New and Renewable Energy (MNRE) to launch pilot projects to leverage green hydrogen to decarbonise various sectors, including transport, steel, and shipping. MNRE has further outlined a framework to incentivise the annual production of 200,000 MT of green hydrogen.
In another development, Oil India had previously invited bids for establishing a 1 MW green hydrogen project in Himachal Pradesh, featuring a 17 Kg/hr generation capacity.