HPPCL Reports Rs. 13.87 bn Revenue from 3,460 MUs
The 100 MW Sainj Hydroelectric Project in Kullu district was the largest contributor by generation among the projects listed. It produced 1,252.56 MUs and generated revenue of Rs. 4.63 bn during the period.
The 65 MW Kashang Stage-I Hydroelectric Project in Kinnaur generated 776.328 MUs and revenue of Rs. 2.52 bn. In Shimla district, the Sawra Kuddu hydroelectric project contributed 1,190.383 MUs and generated Rs. 5.9 bn in revenue, making it the largest revenue contributor in the statement.
Solar projects also contributed to HPPCL’s overall performance. The 5 MW Berra Dol solar power project in Bilaspur generated 62.78 MUs and revenue of Rs. 270.5 mn.
The 32 MW Pekhubela solar power project in Una, inaugurated on June 20, 2024, generated 113.27 MUs and realised revenue of Rs. 328.9 mn. The projects together accounted for the reported generation and revenue, with hydroelectric facilities providing the bulk of both measures.