Karnataka Explores 1,500 MW Floating Solar Potential

The Karnataka government is exploring the development of 1,500 MW of floating solar power projects across suitable reservoirs and other water bodies as part of efforts to expand renewable energy generation and strengthen long-term energy security. The initiative could allow the state to add solar capacity without requiring large tracts of land.

The Karnataka Power Corporation (KPCL) has invited bids for feasibility studies, bathymetric surveys and the preparation of detailed project reports (DPRs) for the proposed floating solar photovoltaic projects. The studies are intended to identify locations that are technically viable and environmentally sustainable for future development.

Energy and Tourism Minister KJ George said the state was assessing the potential for floating solar projects across suitable reservoirs. He said the programme aimed to make productive use of reservoir surfaces while supporting the state’s broader renewable energy objectives.

Floating solar projects use photovoltaic panels installed on specially designed structures that are anchored in reservoirs or other suitable water bodies. The installations can generate renewable electricity while limiting the need for land acquisition, making them an option for areas where land-based solar development may face constraints.

The proposed assessments will examine reservoir characteristics, water depths and seasonal variations in water levels. They will also evaluate the technical and economic feasibility of the projects before decisions are taken on their future development. The findings from the surveys and reports are expected to provide the basis for identifying suitable sites and determining the scale of projects that can be installed at each location.

KPCL’s invitation for bids marks the preliminary stage of the initiative. The feasibility work will help establish whether the targeted reservoirs can support floating structures and associated power infrastructure while maintaining environmental and operational suitability. Karnataka is pursuing the assessment as part of its efforts to broaden its renewable energy portfolio and improve the productive use of existing water resources.

Related Stories

Karnataka Homebuyers Await Possession in 3,145 Incomplete Projects
E20 Petrol Samples Meet Quality Standards, Says Oil Ministry
Karnataka Finds 80 Per Cent of Petrol Samples Above E20 Limit
TIL Revenue Surges 143% to Rs 1.98 Billion in Q2 FY27
India to Develop Civil Aircraft Within Two Years, Build 100 Airports