SS One Single Tower Luxury Project Near Dwarka Expressway

SS Group has launched SS ONE, a single 42-storey luxury residential tower near the Dwarka Expressway in Gurugram. The development is spread across approximately 0.8025 acres and will be executed as a single-phase project with a targeted completion timeline of 2031. Designed with a low-density configuration, SS ONE will offer only three apartments per floor to provide privacy within a high-rise format. Residences are priced starting from Rs 27.5 million (mn).

Apartment sizes range from 1770 sq ft to 1925 sq ft, with layouts offering three to four balconies and generous living spaces. The project comprises exclusively three BHK residences with three bathrooms and an additional powder room in each home. All units have been launched simultaneously and will target premium homebuyers seeking low-density living. The launch reflects a focus on functional luxury and privacy in well-connected urban locations.

Amenities will include two dedicated clubhouses and a range of lifestyle and wellness facilities such as a gymnasium, spa, sauna bath, two swimming pools and a landscaped pool deck. The development will also feature a grand multipurpose hall, a reading lounge, landscaped open terrace areas and a multi-tier security system. These provisions are intended to support a premium residential experience and communal living within the project. The design emphasises generous layouts and amenity driven quality of life.

Strategically located, SS ONE offers proximity to key connectivity corridors with the site approximately three minutes from the Dwarka Expressway, five minutes from NH-48 and 10 minutes from Rajiv Chowk, while Indira Gandhi International Airport can be accessed within 25 minutes. The development is aimed at premium homebuyers, upper-middle and affluent families, and working professionals in Gurugram and the wider NCR region seeking enhanced connectivity and low-density high-rise living. SS Group intends the project to strengthen its presence in the luxury residential segment and to align product design with current market demand trends in Gurugram. The project will be delivered with a single-phase execution strategy and a targeted completion date of 2031.

Related Stories