Arunachal witnesses infra push along border
The frontier highway, a "strategic project," was slated to open in 2022. Work on the project has already begun in some places, with heavy equipment being deployed to expedite the entire process.
The 2,000-kilometer road project, which has previously been opposed by China, will begin in Mago near Bhutan and will continue via Tawang, Upper Subansiri, Tuting, Mechuka, Upper Siang, Debang Valley, Desali, Chaglagam, Kibithu, and Dong before concluding in Vijayanagar near the Myanmar border.
The project is expected to cost at least Rs 400 billion. According to a state transportation department official, there is a proposal to create corridors connecting the highway.
Arunachal Pradesh made aviation history in 2022 when Prime Minister Narendra Modi inaugurated the Rs 645 crore Donyi Polo Airport at Hollongi, the state capital's first such airport, to promote connectivity, trade, and tourism in the rugged state.
Another significant development witnessed by the state is the Sela tunnel, which is being built at a height of 13,700 feet by Border Roads Organisation (BRO) and is slated to be completed by July 2023, with work already underway. Two tunnels of 475 m and 1790 m length are being built through the Sela-Chabrela range that separates West Kameng from Tawang district to reach the existing Balipara-Charduar-Tawang (BCT) road on the Nuranang side, cutting the distance by roughly 8-9 km and travel time by at least an hour. Once completed, the Sela tunnel will be the world's longest bi-lane tunnel.
Also Read
Kollam Junction in Kerala to receive top-notch amenities
Madurai Railway Junction will get Rs 3.47 billion renovation