CM Stalin Inaugurates New 11 Km Highway Stretch in Namakkal District

M K Stalin, Chief Minister, inaugurated an 11.15-kilometre stretch of the Mallikarai-Rasipuram-Thiruchengodu-Erode state highway, which had been widened into a four-lane road under the Chennai-Kanniyakumari Industrial Corridor Project (CKICP). The highway was developed at a cost of Rs 4.24 billion, with funding provided by the Asian Development Bank.

Out of this, 7.75 kilometres of the highway had been expanded to four lanes with a width of 17 metres, while a 3.2-kilometre elevated corridor was constructed along the Thiruchengodu-Pallipalayam highway in Namakkal district. The elevated two-lane road was expected to benefit four villages: Thokkavadi, Kadachanalur, Samayasangili Agraharam, and Pallipalayam, according to an official note.

Addressing allegations about the poor quality of the elevated road between Thiruchengodu and Pallipalayam, the state highways department issued a statement denying the claims. The department stated that the quality of the elevated road had been verified and certified by experts from MSV International - JSV Associates Engineers, and that media reports suggesting poor construction quality of the flyover were baseless and false.

In addition, the chief minister also inaugurated a road overbridge at Pazhanganatham in Madurai, which was built at a cost of Rs 550 million.


News source: New Indian Express

Related Stories

Tamil Nadu CM M K Stalin Inaugurates Infrastructure for Rural Development
Tamil Nadu CM, union minister review Chennai metro project
Stalin launches projects worth Rs 3.5 Bn in Kolathur
Tata Power, Suzlon Ink Rs 60 Billion Wind Energy Deal in Andhra
Odisha Approves Rs 12.6 Billion For 32 New Bridges