Amaravati to Get Rs. 22.45 bn Airport-Style Railway Station
The station will cover 1,500 acres and have 24 high-tech platforms and four terminals. It is expected to handle about 300,000 passengers a day. The Hyderabad-Chennai and Hyderabad-Bengaluru bullet train routes are planned to pass through the station, while direct rail links will also connect Amaravati with cities including Kolkata and Mumbai.
The planned high-speed services are expected to reduce journey times to about 70 minutes for Hyderabad, 112 minutes for Chennai and 2 hours for Bengaluru. A 3.2-km railway bridge over the Krishna River is being constructed as part of the project, alongside a 57-km broad-gauge line connecting Errupalem, Amaravati and Namburu.
A metro line is also planned to provide local connectivity. The Andhra Pradesh Capital Region Development Authority has identified and acquired 80 per cent of the land required for the railway project, which is targeted for completion within 2 to 3 years. The estimated project cost is Rs. 22.45 bn.
The station’s tracks are being designed with fewer curves so trains can pass through without significant speed reductions. An automatic train protection system will support safer operations during fog, extreme weather and emergencies. High-resolution satellite data and 100 years of flood records are being used to floodproof the route and bridge, which are located near the Krishna River.
Solar panels will be installed on the station roof, platform walls and parking area to help meet its electricity requirements. Other planned facilities include LED lighting, ceiling fans and central air conditioning, with the overall design intended to improve passenger comfort and reduce congestion.