Construction of diaphragm wall for underground airport tunnel begins

As part of Package ANVS-RVNL-1682, Afcons Infrastructure started building the diaphragm wall (D-wall) for the underground airport tunnel of Kolkata Metro Line 6 (Orange Line). The Airport Station will be the northern terminal of Kolkata Metro's 29.87-kilometer Line-6, which connects Kavi Subhash New Garia to Biman Bandar. It will also be a stop on the 6.87-kilometer Line-4 (Noapara – Airport). Line 4 will be extended to New Barrackpore in the north.

The station box, which includes four lines and a facility for train stabling, is currently being constructed by ITD Cementation. The Airports Authority of India's land will be traversed by an underground cut-and-cover tunnel that will be constructed by Afcons and measure approximately 950 meters in length.

The Rs were given to Afcons in January 2021. Package ANVS-RVNL-1682 is a civil construction contract worth 532.65 crore that must be finished in 36 months. The Sub CBD-2 Station and Biman Bandar will be connected by this civil package of 3.519 kilometers, most of which will be elevated. Under this, underground sections and a viaduct will be built, two new stations will be built at Chinar Park (formerly Rabindra Tirtha) and VIP Road (Haldiram).

Related Stories

PM Modi flags off Kanpur Metro stretch built by Afcons
Kochi Metro Phase II Faces Possible Delay Over Funding Approval
Afcons Recognised in Burgundy Private Hurun India 500
Railway Board Approves Budgam–Delhi Parcel Train
PFC Secures EUR 150 Million Loan from KfW to Fund RDSS Projects