India's Atmanirbhar underwater metro in Kolkata to launch in December
Sanjay Banerjee, the General Manager Civil of Kolkata Metro Rail Cooperation Limited, highlighted the challenges faced during the project, particularly the careful planning required due to the densely populated areas of Kolkata and the presence of existing buildings. Despite these challenges, the project has made significant progress, with a section of the underground route already operational from Phoolbagan to Sealdah.
The project emphasises the indigenisation of technology, with Indian companies leading the way and Indian engineers playing a pivotal role. The construction of the underwater metro serves as a prime example of the 'Atmanirbhar' initiative, showcasing the capabilities and expertise of Indian engineers. The underwater tunnel spans a length of 520 metres, reaching a depth of 16 metres below the riverbed at its deepest point. The construction of the tunnel, which connects Howrah station complex to Armenian Ghat, was completed in a record time of 66 days. This underwater rail system marks a significant milestone as the first subaqueous tunnel beneath a major river in India.
The authorities aim to open the underwater metro for commercial use by December 2023, providing the people of Kolkata with an advanced and efficient mode of transportation and contributing to the city's urban development.