KMRL trials phase 1-B extension from SN Junction to Tripunithura

Kochi Metro Rail (KMRL) has successfully conducted a trial run for the Phase 1-B extension from SN Junction to Tripunithura. The trial marks a crucial step in the expansion of Kochi's metro network, bringing enhanced connectivity to more areas within the city.

The Phase 1-B extension, spanning from SN Junction to Tripunithura, is a significant addition to Kochi's metro infrastructure. The trial run signifies the successful integration of the new stretch into the existing metro network, ensuring seamless operations and safety compliance.

The expansion aligns with Kochi's vision for a comprehensive and accessible metro system, offering residents and commuters an efficient and sustainable mode of transportation. The trial run is a pivotal prelude to the official inauguration of the extended metro route, showcasing the commitment of KMRL to expanding the city's public transit network.

As Kochi continues to evolve as a smart city, the metro's phased expansions play a crucial role in addressing the growing transportation needs of the populace. The successful trial run not only validates the technical readiness of the new metro stretch but also heralds a new era of enhanced connectivity and accessibility for the residents of Kochi.

Related Stories

Kochi Metro Holds Talks with BPCL to Restore Greenery on Medians
RITES Secures DPR Contract for Kochi Metro Phase 3
Kochi Water Metro Gears Up for Expansion Beyond City Limits
Shriram Properties Launches ‘Codename: The One’ in Bengaluru
India Warehousing Show 2025 Closes with Strong Global Presence