L&T, DRDO ink deal for Scorpene submarines' AIP modules
Namma Metro's Phase-II project consists of extending the existing two corridors of Phase-I, namely the East-West Corridor and the North-South Corridor, as well as building two additional lines, one from R.V. Road to Bommasandra and another from Kalena Agrahara to Nagawara. These lines will run through some of the city's most densely populated and heavily traveled districts. Phase II of the project will improve connectivity and traffic flow in Bengaluru, a heavily populated city. With the completion of Phase II (72.09 km), the combined network of Namma Metro will be 114.39 km long, with 101 stations.
REC Limited is an NBFC based in India that specializes in power sector financing and development. The financial assistance to BMRCL is part of REC's venture into infrastructure development funding. REC Limited began operations in 1969 and has already been in existence for nearly fifty years. It provides financial assistance to the entire power sector value chain, including generation, transmission, distribution, and renewable energy projects. The funding provided by REC shines every fourth bulb in India.
See also:
Bengaluru Metro: Four new lines to enhance connectivity
Byappanahalli-KR Puram metro segment to open on July 15