PM Modi Flags Off Pink Line as Bengaluru Metro Crosses 100 Km

Prime Minister Narendra Modi inaugurated the 7.5-km elevated section of Bengaluru’s Namma Metro Pink Line between Kalena Agrahara and Suddagunte Palya on Friday, taking the city’s operational Metro network beyond 100 km. Karnataka Chief Minister D K Shivakumar, Governor Sudha Yadav and other dignitaries attended the event at SG Palya Metro Station.

Passenger services on the section will begin on Saturday with five trains. From Tuesday to Saturday, trains will start at 6 am from both terminal stations. On Mondays, services will begin at 4.55 am from Kalena Agrahara and 5 am from SG Palya, while Sunday services will start at 7 am. The last trains will leave at 10.50 pm and 10.54 pm from the respective terminals.

The six-station elevated stretch covers Kalena Agrahara, Hulimavu, Bilekahalli-IIMB, NS Palya-JP Nagar 4th Phase, Jayadeva and SG Palya. Weekday peak-hour frequency will be eight minutes, increasing to 10 minutes during non-peak periods. Trains will operate at 10-minute intervals on Saturdays and Sundays. The section was developed at a cost of around Rs. 34.7 bn.

The Pink Line will connect with the Yellow Line at Jayadeva, creating Namma Metro’s third operational interchange after Nadaprabhu Kempegowda station and RV Road station. The interchange integrates two Metro lines with a double-decker flyover and is intended to improve access from south Bengaluru to educational institutions, IIM Bangalore and major business and technology hubs.

The Bengaluru Metropolitan Transport Corporation, working with the Bengaluru Metro Rail Corporation, has installed LED displays at Tavarekere and IIMB stations to provide real-time bus arrival information. Shivakumar called for more equitable Centre-State funding, time-bound approvals and shared responsibility for project costs, while Minister Krishna Byre Gowda sought approval for the proposed Orange Line between Sarjapura and Hebbal. Karnataka has added 31.8 km since 2023 and aims to expand the network beyond 400 km, with a longer-term target of 500 km.

Related Stories

Bengaluru Metro Pink and Blue Lines Get Fresh Deadlines
Alstom Signalling Powers Bengaluru Metro Pink Line Operations
Alstom Signalling Enters Service on Bengaluru Metro's Pink Line