Six Namma Metro Lines Planned for Extension
The proposed extensions include the 15-km stretch from Challaghatta to Bidadi, the 24-km link between Silk Institute and Harohalli, and the 11-km route from Bommasandra to Attibele. All three projects are currently at the feasibility report stage.
Another proposal would extend the line from Kalena Agrahara to Kadugodi Tree Park by about 68 km. It is the longest of the proposed extensions and remains under feasibility assessment. The Madavara-Tumakuru route, covering about 60 km, has progressed to the detailed project report stage.
The sixth proposed extension would connect K.R Puram with Hoskote via Budigere Cross over an estimated 16 km. The project is also at the feasibility report stage. Together, the proposals are intended to broaden rail access beyond the existing urban network and support planned development around Bengaluru.
The proposed expansion is expected to improve connections to employment and education centres, reduce dependence on roads and support industrial and economic activity along the identified corridors. It would also provide links with satellite towns and allow the new sections to integrate with the existing and future metro network.
The proposals come as the Bangalore Metro Rail Corporation (BMRCL) prepares for the opening of the Pink Line. The corporation is awaiting inspection by the Commissioner of Metro Railway Safety before the route can be inaugurated. The line, which was originally expected to open earlier this year, has been delayed and preparations are now being made for a possible launch in October.