JSW Cement Begins Production At Nagaur Plant In North India
The Nagaur integrated plant is equipped with a three point three zero MTPA clinkerisation unit and a two point five zero MTPA cement grinding unit, with an additional one point zero zero MTPA grinding unit under construction. The facility has been positioned to serve the high-growth markets of Rajasthan, Haryana, Punjab and the National Capital Region. The plant is intended to support construction and infrastructure demand across these nearby states.
The Nagaur unit was funded through a strategic mix of equity and long-term debt, with 8,000 mn from the fresh issue proceeds of the initial public offering (IPO) allocated specifically towards part-financing of the unit. Company executives indicated that the project was completed within 21 months and that the expansion advances the company towards its mid-term capacity target of 41.85 MTPA and its long-term vision of 60 MTPA. The commissioning was cited as an example of the company's project execution capabilities.
The plant has been designed as a model of sustainable manufacturing and includes provisions for the co-processing of alternative fuels in the kiln to reduce fossil fuel use. The site features a seven km long overland belt conveyor to transport limestone from the mines, reducing road transport, and will soon include a 16 megawatt (MW) Waste Heat Recovery System to capture and reuse process heat, significantly lowering its carbon footprint. These measures are intended to reduce the environmental impact of transport and to lower the carbon intensity of cement production.