Transport-infrastructure

Pre-construction activities of Hyderabad airport works in full swing

The survey would be finished by the end of the month

Read Full Story

Second 8-Coach Trainset Arrives on Metro Line 3

Additionally, 50% of the track laying work has been finished

Read Full Story

Centre approves over Rs 174 crore for NH Project in Odisha

Will facilitate the smooth movement of heavy vehicles

Read Full Story

Bids invited for Thane-Borivali Twin Tunnel beneath SGNP

The project is estimated to be complete in five years

Read Full Story

RLDA invites RFP for upgradation of Gurgaon railway station

RLDA invites RFP for the upgradation of Gurgaon railway station

Read Full Story

Mumbai Metro: 2A & 7 services to begin from 20 Jan

Metro 2A and 7 towards completion; services to begin from January 20

Read Full Story

Use of prefab to accelerate road construction

From 33 km per day to 100-150 km per day possible says minister

Read Full Story

India’s 762 km long rail track with ABS in Ghaziabad

Automatic Block Signaling (ABS) contributes to train movement control

Read Full Story

Construction of Bullet train continues in full swing

About 92,900 passengers will use the system each day

Read Full Story

Blackspots on national highways being addressed by NHAI

In FY2021–2022, approximately 176 blackspots were fixed.

Read Full Story

The elevated road between Airoli and Katai Naka is 88% completed

The twin tunnels project will help decongest Kalyan, Dombivli.

Read Full Story

Alstom Transport to commence manufacturing coaches for Chennai Metro

Chennai Metro Phase 2 Project consists of three corridors.

Read Full Story