Transport-infrastructure

CE in charge of Bengaluru metro work not named in FIR

Chief engineer in charge of Bengaluru metro work not named in FIR

Read Full Story

60% of track laying work completed in Colaba-Bandra-SEEPZ Corridor

Mumbai Metro Rail Corporation, MMRC, Mumbai Metro, Colaba-Bandra-SEEPZ

Read Full Story

Aqua Line of Noida Metro will include 8 stations

Footover bridges to be built between Sector 142 and Botanical Garden.

Read Full Story

Nariman Point–Cuffe Parade Bridge receives two bidders

The new bridge spans 1.6 kilometres and has four lanes

Read Full Story

The Mumbai Trans-Harbour Link will be operational in November

90% of the civil work on the total 21.8 km bridge has been completed

Read Full Story

Delhi govt approves first phase of elevated corridor in Najafgarh

The bridge will have a 4.8 kilometre length

Read Full Story

Rameswaram railway station will have airport-style infrastructure: SR

Renovations are part of flagship station refurbishment initiative.

Read Full Story

Government to invite EoI for Concor privatisation

Preliminary Information Memorandum inviting EoI will be released soon.

Read Full Story

Mumbai Trans-Harbour Link will be made operational by November: Shinde

90% civil construction of the 22-km long bridge has been completed

Read Full Story

L&T’s TBM Urja achieves third breakthrough of Bengaluru Pink Line

This marks the 5th in a series of 6 tunnel breakthroughs.

Read Full Story

PM Modi to inaugurate Navi Mumbai Metro’s 5.96-km stretch

The 35-km stretch of lines 2A and seven will also be commissioned.

Read Full Story

RVNL bags contract of Rs 11.34 billion from Chennai Metro Rail Project

Saw a 36.5 per cent jump in net profit in the September quarter.

Read Full Story