SECI Floats Tender for 2 GW Solar Projects with Storage

The Solar Energy Corporation of India (SECI) has invited bids for the development of 2 GW of grid-connected solar projects, coupled with 1 GW/4 GWh of energy storage systems (ESS), to be implemented on a build-own-operate basis across India.

As part of the tender conditions, each 1 MW of solar capacity must be supported by an ESS capacity of at least 500 kW/2 MWh. Developers may either own the energy storage systems themselves or enter into third-party arrangements for the provision of power through separate ESS operators.

SECI will enter into 25-year power purchase agreements (PPAs) with the selected project developers, providing long-term revenue assurance.

This initiative marks another significant step in India’s push to strengthen its renewable energy base with hybrid solar-plus-storage solutions, enhancing grid stability, reducing intermittency, and supporting the nation’s clean energy transition.

Related Stories

SECI Makes Site Visit Mandatory For 100 kW Rooftop Solar
SECI Tenders 700 MW of Solar Capacity for C&I Offtake
SECI Issues 700 MW Solar Tender for C&I Consumers in SEZ Areas
Mumbai-Ahmedabad Bullet Train’s Surat-Vapi Section Set for 2027
Indian Railways Approves Four Projects Worth Rs. 7.36 bn Across Four States