Transport-infrastructure

The Mumbai Trans-Harbour Link will be operational in November

90% of the civil work on the total 21.8 km bridge has been completed

Read Full Story

Delhi govt approves first phase of elevated corridor in Najafgarh

The bridge will have a 4.8 kilometre length

Read Full Story

Rameswaram railway station will have airport-style infrastructure: SR

Renovations are part of flagship station refurbishment initiative.

Read Full Story

Government to invite EoI for Concor privatisation

Preliminary Information Memorandum inviting EoI will be released soon.

Read Full Story

Mumbai Trans-Harbour Link will be made operational by November: Shinde

90% civil construction of the 22-km long bridge has been completed

Read Full Story

L&T’s TBM Urja achieves third breakthrough of Bengaluru Pink Line

This marks the 5th in a series of 6 tunnel breakthroughs.

Read Full Story

PM Modi to inaugurate Navi Mumbai Metro’s 5.96-km stretch

The 35-km stretch of lines 2A and seven will also be commissioned.

Read Full Story

RVNL bags contract of Rs 11.34 billion from Chennai Metro Rail Project

Saw a 36.5 per cent jump in net profit in the September quarter.

Read Full Story

Traffic-calming measures are used by NHAI on the Mumbai-Agra motorway

Implemented at nine intersections along the Mumbai-Agra route.

Read Full Story

980 billion Delhi-Mumbai Expressway project expected by end of 2023

Once completed the expressway will decrease the travel time in half

Read Full Story

For stalled construction of Ejipura flyover, BBMP publishes new tender

The tender floated for construction cost worth INR 1.44 billion.

Read Full Story

RLDA would lease a block of land in Dwarka for 11.93 billion

Bids for leasing out plot of railway land of 124,000 sq mtr

Read Full Story