Transport-infrastructure
Metro 8: Mumbai-Navi Mumbai Airport Link Cleared
30 Jan 202535-km Gold Line to Boost Connectivity
Read Full Story
Kolkata Conducts Successful Trial Run on Noapara-Airport Metro Route
29 Jan 2025The service is set to be operational by mid-2025.
Read Full Story
BBMP Invites DPR Bids for KR Tunnel and 10 Elevated Corridors
29 Jan 2025The proposed tunnel is expected to be a double-decker system.
Read Full Story
MP Brijesh Chowta Lays Foundation for Kadaba Road Project
29 Jan 2025Rs 24 million was approved for a multipurpose centre.
Read Full Story
Funding Challenges Delay Nagari-Tindivanam Railway Link Project
29 Jan 2025The line will pass through the Cheyyar and Palar rivers, national highways, and four-lane highways.
Read Full Story
Large Section of 133-km Chennai Peripheral Ring Road to Finish by Year-end
29 Jan 2025Read Full Story
AAI Allocates Rs 186 Million for Trichy Airport Expansion
29 Jan 2025A new ATC tower and technical block are being built.
Read Full Story
Mumbai Coastal Road to Fully Open by February
29 Jan 2025The project will reduce travel time and help mitigate pollution.
Read Full Story
Mumbai's T1 to Partially Close for Redevelopment in Q3FY26
29 Jan 2025The redevelopment is anticipated to impact major airlines.
Read Full Story
Indian Railways Boosts Speed with Major Track Upgrades
29 Jan 202523,000 km of tracks upgraded for 130 kmph travel
Read Full Story
Page {{currentPage}} of {{pageCount}}
{{#products}}
{{title}}
{{/products}}
{{copy}}