Transport-infrastructure
Mumbai-Ahmedabad Bullet Train Project Slab Casting Starts at Virar Station
06 Jun 2025Read Full Story
State Cabinet to Approve Rs 195.79 Bn Hyderabad Metro Phase 2B Project
06 Jun 2025Phase 2 of the metro project is divided into two segments: Phase 2 ‘A’ and Phase 2 ‘B’.
Read Full Story
Water Taxi from Colaba to Navi Mumbai Airport May Cut 40 Minutes Travel
06 Jun 2025The water taxis will operate from a newly constructed jetty near the Radio Club in Colaba.
Read Full Story
Maha-Metro Starts Groundwork for Kharadi-Khadakwasla Corridor Before Nod
06 Jun 2025Read Full Story
CM Fadnavis opens last stretch of 701-km Samruddhi Mahamarg
05 Jun 2025Travel time between Mumbai-Nagpur will reduce now significantly.
Read Full Story
Page {{currentPage}} of {{pageCount}}
{{#products}}
{{title}}
{{/products}}
{{copy}}