Transport-infrastructure

Work on Chennai’s First Cable-Stayed Bridge Set to Begin Soon

Two additional cable-stayed bridges will also be constructed along the 20-km-long double-decker corridor—one at Koyambedu and another at Maduravoyal.

Read Full Story

MMRDA Seeks Rs 5.50 Bn Property Tax Waiver on Metro Yards and RMC Plants

This request follows a letter sent by the BMC in December 2024, demanding recovery of the pending dues.

Read Full Story

Bridging the Gap

India’s bridges reflect a legacy of engineering excellence and national pride – from ancient marvels like the Ram Setu to modern icons like the Chenab Bridge. CW explores the technologies, policies and challenges shaping the future of connectivity

Read Full Story

Buying a TBM?

CW runs through essential and desirable features of tunnel-boring machines.

Read Full Story

FASTag Annual Pass May Cut Toll Operators’ Revenue by 4–8%

The compensation process will involve consultation with stakeholders and finalisation of modalities which could lead to some delays.

Read Full Story

MoRTH to Frame IRC Norms for New-Age Machines in Highway Work

The ministry has also sought feedback on adoption of AIMC

Read Full Story

Vikaspuri Road Upgrade, Tree Drive to Boost Delhi Constituency

Minister Launches New Road And Tree Drive To Aid Vikaspuri's Growth

Read Full Story

Sharavathi Cable-Stayed Bridge Clears Load Test

Deflection well within limit; opening slated post-monsoon.

Read Full Story

TBM Nayak Assembly Begins for Thane–Borivali Twin Tunnel

Machine to bore 10 km road link beneath SGNP by late-2026.

Read Full Story

Vizag Metro Depots Need 100 Acres, Rs 8.9 Bn Land Spend

Two depots at Old Dairy Farm and Port site form core of phase one.

Read Full Story

Kolkata Metro Cuts Emissions with Regenerative Braking Tech

New rakes generate power while braking, saving energy costs.

Read Full Story

Kochi Metro Speeds Up Kakkanad Line Amid Monsoon Work Push

Phase 2 targets December 2026 finish despite earlier delays.

Read Full Story