Dedicated financing support key to scaling up rooftop solar in SME sector
Real Estate

Dedicated financing support key to scaling up rooftop solar in SME sector

The Micro, Small, and Medium Enterprises (MSME) sector is expected to contribute significantly to achieving the government’s target of building 40 GW of the rooftop solar capacity by 2022. Scaling up rooftop solar in the MSME sector in India requires addressing issues related to lack of low-cost financing, inadequate level of awareness, and lack of rooftop aggregation models, according to a new report from Deloitte and Climate Investment Funds (CIF).

The report ‘Scaling up rooftop solar in the SME sector in India’ evaluates key issues based on the primary survey done across 150 MSMEs in six industrial clusters (rubber and plastic; pharmaceuticals; auto; paper; food and beverage; and textiles) in India, selected on the basis of a pre-determined criteria. The report recommends possible solutions for triggering rooftop solar growth in the MSME sector in India.

“A well-conceived walk-through survey of 150 MSMEs depicted the willingness towards adoption of rooftop solar applications but strengthening an enabling ecosystem will be critical for its proliferation,” says Tushar Sud, Partner, Deloitte Touche Tohmatsu India LLP.

“Limited access to finance, need to strengthen awareness, and escalating energy expenses are impacting the long-term profitability, competitiveness, and sustainability of the sector. However, it presents great opportunity, and a multi-pronged approach involving supportive regulations, risk-bearing financing, and awareness building is needed to demonstrate viability and help scale up rooftop solar in the sector,” says Abhishek Bhaskar, Energy Specialist, CIF.

The report highlights possible solutions to address the key barriers affecting rooftop solar growth in the MSME sector. Some of them are as follows:

  • In the initial stages, target industry clusters where the likelihood of achieving intended outcomes is higher and developing customised market plans is imperative.
  • The Indian rooftop solar market is currently not geared to implement large-scale rooftop solar projects under the OPEX model in the MSME sector without institutional or financial interventions. A dedicated aggregation vehiclecould support the implementation of rooftop solar projects across the target MSME clusters.
  • Regulatory changes for the adoption of group and virtual net metering could assist in implementing aggregation models in the MSME clusters and overcoming issues related to scale, diverse customer profile, and financing.
  • Supporting dedicated MSME-based portfolios within existing or new lines of concessional credit is expected to support the development of rooftop solar projects in the MSME sector.
  • Dedicated scheme supported by the Ministry of MSME with financial interventions, such as interest subvention and the Partial Risk Guarantee Fund mechanism, through budgetary allocations may be required for pilot projects across target clusters.
  • Creating awareness and capacity building through dedicated initiatives to bridge knowledge gaps and support the adoption of rooftop solar in the MSME sector.

“World Bank has long supported India’s renewable energy ambitions, including rooftop solar, which is an integral part of our clean energy strategy. Supported by the Clean Technology Fund (CTF), the program has delivered financing to close to 300 MW so far working in close partnership with State Bank of India (SBI), and is all poised to surpass its initial goals. This CTF supported work is quite timely since a significant amount of this financing goes to installations for MSMEs, a sector that we have also identified as one of the potential areas for future growth” says Simon Stolp, Lead Energy Specialist, The World Bank.

The Micro, Small, and Medium Enterprises (MSME) sector is expected to contribute significantly to achieving the government’s target of building 40 GW of the rooftop solar capacity by 2022. Scaling up rooftop solar in the MSME sector in India requires addressing issues related to lack of low-cost financing, inadequate level of awareness, and lack of rooftop aggregation models, according to a new report from Deloitte and Climate Investment Funds (CIF).The report ‘Scaling up rooftop solar in the SME sector in India’ evaluates key issues based on the primary survey done across 150 MSMEs in six industrial clusters (rubber and plastic; pharmaceuticals; auto; paper; food and beverage; and textiles) in India, selected on the basis of a pre-determined criteria. The report recommends possible solutions for triggering rooftop solar growth in the MSME sector in India.“A well-conceived walk-through survey of 150 MSMEs depicted the willingness towards adoption of rooftop solar applications but strengthening an enabling ecosystem will be critical for its proliferation,” says Tushar Sud, Partner, Deloitte Touche Tohmatsu India LLP.“Limited access to finance, need to strengthen awareness, and escalating energy expenses are impacting the long-term profitability, competitiveness, and sustainability of the sector. However, it presents great opportunity, and a multi-pronged approach involving supportive regulations, risk-bearing financing, and awareness building is needed to demonstrate viability and help scale up rooftop solar in the sector,” says Abhishek Bhaskar, Energy Specialist, CIF.The report highlights possible solutions to address the key barriers affecting rooftop solar growth in the MSME sector. Some of them are as follows:In the initial stages, target industry clusters where the likelihood of achieving intended outcomes is higher and developing customised market plans is imperative.The Indian rooftop solar market is currently not geared to implement large-scale rooftop solar projects under the OPEX model in the MSME sector without institutional or financial interventions. A dedicated aggregation vehiclecould support the implementation of rooftop solar projects across the target MSME clusters.Regulatory changes for the adoption of group and virtual net metering could assist in implementing aggregation models in the MSME clusters and overcoming issues related to scale, diverse customer profile, and financing.Supporting dedicated MSME-based portfolios within existing or new lines of concessional credit is expected to support the development of rooftop solar projects in the MSME sector.Dedicated scheme supported by the Ministry of MSME with financial interventions, such as interest subvention and the Partial Risk Guarantee Fund mechanism, through budgetary allocations may be required for pilot projects across target clusters.Creating awareness and capacity building through dedicated initiatives to bridge knowledge gaps and support the adoption of rooftop solar in the MSME sector.“World Bank has long supported India’s renewable energy ambitions, including rooftop solar, which is an integral part of our clean energy strategy. Supported by the Clean Technology Fund (CTF), the program has delivered financing to close to 300 MW so far working in close partnership with State Bank of India (SBI), and is all poised to surpass its initial goals. This CTF supported work is quite timely since a significant amount of this financing goes to installations for MSMEs, a sector that we have also identified as one of the potential areas for future growth” says Simon Stolp, Lead Energy Specialist, The World Bank.

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code