Power  machine
POWER & RENEWABLE ENERGY

Power machine

Powered by battery or power pack and weighing only 3.2 kg, Pressgun 5 by Viega easily presses all dimensions from 12 to 108 mm. It is one of the smallest light-weight press machines for XL press connection on the market. Viega has achieved the weight through its compact structure, a light housi...

Powered by battery or power pack and weighing only 3.2 kg, Pressgun 5 by Viega easily presses all dimensions from 12 to 108 mm. It is one of the smallest light-weight press machines for XL press connection on the market. Viega has achieved the weight through its compact structure, a light housing construction and a new lithium-ion battery. It is possible to work full-day on the building site using the battery without worrying about recharging it at an interval. The integrated monitoring electronics and an improved cold-start feature effectively protect against deep discharge, thus guaranteeing a long lifespan of the battery. Contact: Viega. Website: www.viega.com

Next Story
Infrastructure Transport

MMRDA Removes 1.14 lakh m of Metro Barricades

In a bid to ease congestion and improve urban mobility during monsoon, MMRDA has undertaken one of the largest coordinated barricade removal and monsoon preparedness drives across its ongoing metro and infrastructure projects.With substantial progress achieved in viaduct and structural works across multiple metro corridors, barricades from completed stretches beneath metro viaducts are being systematically removed, restoring maximum possible road space before the monsoon. Wider carriageways across key arterial roads are expected to improve traffic flow, reduce congestion, support better rainwa..

Next Story
Infrastructure Transport

Pune Division to Remove All Diamond Crossings by Year-End

The Pune railway division has announced plans to remove all 16 diamond crossings by the end of 2026 as part of a major yard remodelling project following the derailment of a Vande Bharat Express at Pune Junction on April 27. Railway authorities said the replacements aim to improve safety and streamline train operations across the busy station. The decision followed a Central Railway finding that the accident involved a non-standard diamond crossing and highlighted the need for replacement. Regular maintenance of existing crossings will continue until the replacement work is completed. Official..

Next Story
Infrastructure Urban

Goa Declares 80 Million Square Metres No Development Zone

The Goa state government has declared 80 million square metres (mn) of land a no development zone, designating the area as protected from new construction. The notification reclassifies tracts across the state under a no development category for planning and regulatory purposes. The declaration signals a formal halt to new building permits within the defined zone. Authorities indicated that maps will be issued to show broad boundaries while detailed surveys will refine precise limits. The move transfers responsibility for enforcement to local planning authorities and relevant departments, whic..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement