+
BHEL Secures EPC Orders Worth Rs 130–150 Bn from MPPGCL
POWER & RENEWABLE ENERGY

BHEL Secures EPC Orders Worth Rs 130–150 Bn from MPPGCL

Bharat Heavy Electricals (BHEL) has secured two major orders from MP Power Generating Company (MPPGCL) for the Amarkantak and Satpura supercritical thermal power projects, valued between Rs 130–150 billion (excluding taxes and duties).

The notifications of award (NoA) cover EPC packages for 1x660 MW Amarkantak Unit 6 and 1x660 MW Satpura Unit 12. The scope of work includes the supply of equipment, civil construction, erection, and commissioning of the plants.

BHEL will execute the projects with a completion schedule of 57 months from the date of the award for each unit. The orders reinforce BHEL’s leadership in delivering large-scale thermal power projects and its continued contribution to India’s energy infrastructure.

News source: Rediff

Bharat Heavy Electricals (BHEL) has secured two major orders from MP Power Generating Company (MPPGCL) for the Amarkantak and Satpura supercritical thermal power projects, valued between Rs 130–150 billion (excluding taxes and duties).The notifications of award (NoA) cover EPC packages for 1x660 MW Amarkantak Unit 6 and 1x660 MW Satpura Unit 12. The scope of work includes the supply of equipment, civil construction, erection, and commissioning of the plants.BHEL will execute the projects with a completion schedule of 57 months from the date of the award for each unit. The orders reinforce BHEL’s leadership in delivering large-scale thermal power projects and its continued contribution to India’s energy infrastructure.News source: Rediff

Next Story
Infrastructure Transport

Lucknow Metro East-West Corridor Consultancy Contract Awarded

The Uttar Pradesh Metro Rail Corporation has awarded the first construction-related consultancy contract for the Lucknow Metro East West Corridor to a joint venture of AYESA Ingenieria Arquitectura SAU and AYESA India Pvt Ltd. The firm was declared the lowest bidder for the Detailed Design Consultant contract for Lucknow Metro Line-2 under Phase 1B and the contract was recommended following the financial bid. The contract is valued at Rs 159.0 million (mn), covering design services for the corridor. Lucknow Metro Line-2 envisages the construction of an 11.165 kilometre corridor connecting Cha..

Next Story
Infrastructure Urban

Div Com Kashmir Urges Fast Tracking Of Jhelum Water Transport Project

The Divisional Commissioner of Kashmir has called for the fast-tracking of the Jhelum water transport project, urging district administrations and relevant agencies to accelerate planning and clearances. In a meeting convened at the divisional headquarters, the commissioner instructed officials from irrigation, public health engineering and municipal departments to prioritise the project and coordinate survey and design work. The directive emphasised removal of administrative bottlenecks and close monitoring to ensure timely mobilisation of resources and contractors. Officials were told to in..

Next Story
Infrastructure Urban

Interarch Reports Strong Q3 And Nine Month Results

Interarch Building Solutions Limited reported unaudited results for the third quarter and nine months ended 31 December 2025, recording strong revenue growth driven by execution and a robust order book. Net revenue for the third quarter rose by 43.7 per cent to Rs 5.225 billion (bn), compared with Rs 3.636 bn a year earlier, reflecting heightened demand in pre-engineered building projects. The company’s total order book as at 31 January 2026 stood at Rs 16.85 bn, supporting near-term visibility. EBITDA excluding other income for the quarter increased by 43.2 per cent to Rs 503 million (mn),..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App