KPI acquires 4.20 MW wind-solar hybrid power project
POWER & RENEWABLE ENERGY

KPI acquires 4.20 MW wind-solar hybrid power project

A new order for the 4.20 MW wind-solar hybrid power project has been given to KPI Green Energy.

The 4.20 MW order consists of 3.0 MWdc solar power and 4.20 MW wind power.

This order was given to the business by Nouveau Jewellery LLP in Surat. This order was received by the company's "Captive Power Producer (CPP)" business division.

KPI Green Energy recently signed PPAs with six separate organisations for the provision of up to 15.88 MW of capacity.

In accordance with this PPA, the companies will get electricity from the future Wind-Solar Hybrid Power Project in Bhavnagar, Gujarat, which will have a 16.10 MW wind and 10 MW solar capacity.

Also read:
Serentica introduces platform for sustainable energy
Punjab to solarise 100,000 agricultural tube-wells


A new order for the 4.20 MW wind-solar hybrid power project has been given to KPI Green Energy. The 4.20 MW order consists of 3.0 MWdc solar power and 4.20 MW wind power. This order was given to the business by Nouveau Jewellery LLP in Surat. This order was received by the company's Captive Power Producer (CPP) business division. KPI Green Energy recently signed PPAs with six separate organisations for the provision of up to 15.88 MW of capacity. In accordance with this PPA, the companies will get electricity from the future Wind-Solar Hybrid Power Project in Bhavnagar, Gujarat, which will have a 16.10 MW wind and 10 MW solar capacity. Also read: Serentica introduces platform for sustainable energy Punjab to solarise 100,000 agricultural tube-wells

Related Stories

Gold Stories

Hi There!

Now get regular updates from CW Magazine on WhatsApp!

Click on link below, message us with a simple hi, and SAVE our number

You will have subscribed to our Construction News on Whatsapp! Enjoy

+91 86574 75330

Join us Telegram

Reach out to us

Call us at +91 8108603000 or

Schedule a Call Back