+
BMW Industries to Expand Steel Manufacturing in Jharkhand
Steel

BMW Industries to Expand Steel Manufacturing in Jharkhand

BMW Industries Limited is set to establish a Downstream Steel Complex in Bokaro, Jharkhand — India’s second-highest steel-producing state. The project aims to enhance its presence in downstream steel processing with:

300,000 TPA of Cold Rolled Full Hard Coil/Sheet 540,000 TPA of Galvanized Coil/Sheet 200,000 TPA of Color Coated Coils/Sheets

The Rs 8.03 billion ($97 million) project will be funded through internal accruals and debt. Its strategic location, 300 km from Haldia/Kolkata port, ensures better access to global markets and steady raw material supply.

BMW Industries has received the required environmental clearances and plans to operationalize the plant in stages, with the first unit expected to be commercially functional by FY26.

BMW Industries Limited is set to establish a Downstream Steel Complex in Bokaro, Jharkhand — India’s second-highest steel-producing state. The project aims to enhance its presence in downstream steel processing with: 300,000 TPA of Cold Rolled Full Hard Coil/Sheet 540,000 TPA of Galvanized Coil/Sheet 200,000 TPA of Color Coated Coils/Sheets The Rs 8.03 billion ($97 million) project will be funded through internal accruals and debt. Its strategic location, 300 km from Haldia/Kolkata port, ensures better access to global markets and steady raw material supply. BMW Industries has received the required environmental clearances and plans to operationalize the plant in stages, with the first unit expected to be commercially functional by FY26.

Next Story
Infrastructure Transport

Lucknow Metro East-West Corridor Consultancy Contract Awarded

The Uttar Pradesh Metro Rail Corporation has awarded the first construction-related consultancy contract for the Lucknow Metro East West Corridor to a joint venture of AYESA Ingenieria Arquitectura SAU and AYESA India Pvt Ltd. The firm was declared the lowest bidder for the Detailed Design Consultant contract for Lucknow Metro Line-2 under Phase 1B and the contract was recommended following the financial bid. The contract is valued at Rs 159.0 million (mn), covering design services for the corridor. Lucknow Metro Line-2 envisages the construction of an 11.165 kilometre corridor connecting Cha..

Next Story
Infrastructure Urban

Div Com Kashmir Urges Fast Tracking Of Jhelum Water Transport Project

The Divisional Commissioner of Kashmir has called for the fast-tracking of the Jhelum water transport project, urging district administrations and relevant agencies to accelerate planning and clearances. In a meeting convened at the divisional headquarters, the commissioner instructed officials from irrigation, public health engineering and municipal departments to prioritise the project and coordinate survey and design work. The directive emphasised removal of administrative bottlenecks and close monitoring to ensure timely mobilisation of resources and contractors. Officials were told to in..

Next Story
Infrastructure Urban

Interarch Reports Strong Q3 And Nine Month Results

Interarch Building Solutions Limited reported unaudited results for the third quarter and nine months ended 31 December 2025, recording strong revenue growth driven by execution and a robust order book. Net revenue for the third quarter rose by 43.7 per cent to Rs 5.225 billion (bn), compared with Rs 3.636 bn a year earlier, reflecting heightened demand in pre-engineered building projects. The company’s total order book as at 31 January 2026 stood at Rs 16.85 bn, supporting near-term visibility. EBITDA excluding other income for the quarter increased by 43.2 per cent to Rs 503 million (mn),..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App