+
Haryana Plans 107-Acre Land Acquisition for Gurugram Roads
ROADS & HIGHWAYS

Haryana Plans 107-Acre Land Acquisition for Gurugram Roads

The Haryana government has prepared a proposal to acquire around 107 acres of land for constructing missing 24-metre-wide internal roads in sectors 81 to 86 and Sector 104 of Gurugram. The acquisition forms the first phase of a wider plan covering roads across sectors 58 to 115.

A joint site inspection committee (JSIC), constituted on the directions of J Ganesan, director general of the Department of Town and Country Planning, identified the land pockets required for the roads. The proposal will be sent to higher authorities for approval before acquisition proceedings begin.

The proposed acquisition includes 6 acres from Gurgaon and Dhanwapur villages for Sector 104, 16 acres from Lakhanola and Nawada Fatehpur for Sector 81, and 15 acres from Lakhanola, Manesar and Shikohpur for Sector 81A. Sector 82 requires 3 acres, while Sector 82A requires 11 acres from surrounding villages.

Sector 83 will require 16 acres from Shikohpur, Kherki Daula and Sihi, while 17 acres from Sihi, Bamdoli and Badha have been identified for Sector 84. The plan also includes 11 acres for Sector 85 and 12 acres for Sector 86, with land identified in Badha, Sikandarpur Badha and Nawada Fatehpur.

Under the Gurgaon-Manesar Master Plan 2031, developers were responsible for building 24-metre internal sector roads within licensed areas. Several roads, however, remained incomplete because of legal disputes and the unavailability of land. A Department of Town and Country Planning survey found that 1,158 acres would be needed for roads across sectors 58 to 115.

The JSIC has been directed to submit a technical proposal-cum-feasibility report to the Chief Administrator of Haryana Shahri Vikas Pradhikaran in Panchkula. The initial acquisition will be funded through the Department of Town and Country Planning's external development charges budget, while funding for the remaining parcels will be decided later.

The Haryana government has prepared a proposal to acquire around 107 acres of land for constructing missing 24-metre-wide internal roads in sectors 81 to 86 and Sector 104 of Gurugram. The acquisition forms the first phase of a wider plan covering roads across sectors 58 to 115. A joint site inspection committee (JSIC), constituted on the directions of J Ganesan, director general of the Department of Town and Country Planning, identified the land pockets required for the roads. The proposal will be sent to higher authorities for approval before acquisition proceedings begin. The proposed acquisition includes 6 acres from Gurgaon and Dhanwapur villages for Sector 104, 16 acres from Lakhanola and Nawada Fatehpur for Sector 81, and 15 acres from Lakhanola, Manesar and Shikohpur for Sector 81A. Sector 82 requires 3 acres, while Sector 82A requires 11 acres from surrounding villages. Sector 83 will require 16 acres from Shikohpur, Kherki Daula and Sihi, while 17 acres from Sihi, Bamdoli and Badha have been identified for Sector 84. The plan also includes 11 acres for Sector 85 and 12 acres for Sector 86, with land identified in Badha, Sikandarpur Badha and Nawada Fatehpur. Under the Gurgaon-Manesar Master Plan 2031, developers were responsible for building 24-metre internal sector roads within licensed areas. Several roads, however, remained incomplete because of legal disputes and the unavailability of land. A Department of Town and Country Planning survey found that 1,158 acres would be needed for roads across sectors 58 to 115. The JSIC has been directed to submit a technical proposal-cum-feasibility report to the Chief Administrator of Haryana Shahri Vikas Pradhikaran in Panchkula. The initial acquisition will be funded through the Department of Town and Country Planning's external development charges budget, while funding for the remaining parcels will be decided later.

Related Stories

Gold Stories

Next Story
Infrastructure Transport

Mumbai-Ahmedabad Bullet Train’s Surat-Vapi Section Set for 2027

The first section of the Mumbai-Ahmedabad Bullet Train corridor, linking Surat and Vapi, is targeted to begin services in 2027. Construction is expected to be completed by December 2026, while Railway Minister Ashwini Vaishnaw has indicated that an inauguration could take place around the middle of 2027. The National High Speed Rail Corporation (NHSRCL) said the train being manufactured in India is expected to reach the tracks around April or May 2027. The train will undergo extensive testing before the section is opened for passenger services. The project began construction in 2021 and includ..

Next Story
Infrastructure Transport

Indian Railways Approves Four Projects Worth Rs. 7.36 bn Across Four States

Indian Railways has approved four projects with a combined value of Rs. 7.36 bn across Uttar Pradesh, Maharashtra, Andhra Pradesh and Gujarat. The programme covers train protection, signalling, electric traction supply and a road overbridge, with each project assigned to a different railway zone. In Uttar Pradesh, Rs. 2.52 bn has been approved to extend the Kavach 4.0 automatic train protection system across 607.7 km in the Lucknow Division of North Eastern Railway. The system monitors train movements and can apply the brakes if a driver fails to observe a signal or exceeds a safe speed. The w..

Next Story
Infrastructure Urban

Chandru Raheja Sells 1.49% Stake in Mindspace REIT for Rs. 5 bn

Billionaire Chandru Lachmandas Raheja has sold a 1.49 per cent holding in Mindspace Business Parks REIT for Rs. 5 bn through a bulk deal on the BSE. The transaction involved 9.9 mn units and was executed at an average price of Rs. 505 per unit, according to exchange data. Following the sale, units of Mindspace Business Parks REIT were trading 0.18 per cent lower at Rs. 504.05 on Tuesday. Exchange data did not identify the buyers involved in the transaction. Raheja is the chairman of real estate company K Raheja Corp. The sale involved 99,00,990 units, representing 1.49 per cent of the Mumbai-b..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code