Mumbai Coastal Road to partially connect with Bandra Worli Sea Link
ROADS & HIGHWAYS

Mumbai Coastal Road to partially connect with Bandra Worli Sea Link

The final link between the Mumbai Coastal Road and the Bandra Worli Sea Link (BWSL), a ?bow-string? arch bridge, is scheduled for partial opening by the Brihanmumbai Municipal Corporation (BMC) later this month. Bhushan Gagrani, Mumbai?s municipal commissioner and state-appointed administrator confirmed.

Once operational, the new bridge will allow vehicles to travel directly between Nariman Point and Bandra via the sea link. Currently, the coastal road extends only to Worli. A civic official noted, "One of the two arms of the arch bridge is nearly ready for vehicular use, and we expect it to open around or after September 10. We are now finishing ancillary tasks such as painting signage and illuminating the bridge."

Following the bridge?s opening, north-bound vehicles from Nariman Point will be able to enter the Sea Link directly and exit at Bandra. South-bound vehicles will continue to use the existing entry points at Worli. ?North-bound traffic can now access the Sea Link without exiting at the Worli interchange. The south-bound access remains unchanged at Worli and Haji Ali,? the official added.

The opening, initially planned for late July, was delayed due to heavy rainfall and high tidal waves, which impacted construction. However, with recent drier conditions, the civil work has accelerated. The arch bridges, each weighing approximately 4,000 metric tonnes and measuring around 140 meters in length, are expected to enhance connectivity significantly. Currently, the coastal road operates from 7 am to 11 pm on weekdays. (The Indian Express)

The 14th RAHSTA Expo, part of the India Construction Festival, will be held on October 9 and 10, 2024, at the Jio Convention Centre in Mumbai. For more details, visit: https://rahstaexpo.com

The final link between the Mumbai Coastal Road and the Bandra Worli Sea Link (BWSL), a ?bow-string? arch bridge, is scheduled for partial opening by the Brihanmumbai Municipal Corporation (BMC) later this month. Bhushan Gagrani, Mumbai?s municipal commissioner and state-appointed administrator confirmed. Once operational, the new bridge will allow vehicles to travel directly between Nariman Point and Bandra via the sea link. Currently, the coastal road extends only to Worli. A civic official noted, One of the two arms of the arch bridge is nearly ready for vehicular use, and we expect it to open around or after September 10. We are now finishing ancillary tasks such as painting signage and illuminating the bridge. Following the bridge?s opening, north-bound vehicles from Nariman Point will be able to enter the Sea Link directly and exit at Bandra. South-bound vehicles will continue to use the existing entry points at Worli. ?North-bound traffic can now access the Sea Link without exiting at the Worli interchange. The south-bound access remains unchanged at Worli and Haji Ali,? the official added. The opening, initially planned for late July, was delayed due to heavy rainfall and high tidal waves, which impacted construction. However, with recent drier conditions, the civil work has accelerated. The arch bridges, each weighing approximately 4,000 metric tonnes and measuring around 140 meters in length, are expected to enhance connectivity significantly. Currently, the coastal road operates from 7 am to 11 pm on weekdays. (The Indian Express)

Next Story
Infrastructure Urban

Coimbatore: Councillors question drone use for property tax assessment

Several councillors expressed their concerns at the Coimbatore Corporation Council meeting regarding discrepancies in property tax assessments conducted using drones. In response to the queries, corporation commissioner M Sivaguru Prabakaran explained that drones were utilised to identify residential buildings that had been converted into commercial ones, detect plan violations, and spot new buildings that had not been assessed. He added that besides drone surveys, corporation officials would physically measure these properties. He mentioned that the measurement details would be sent to th..

Next Story
Infrastructure Energy

Oil prices dip as US output resumes post-storm and rig count increases

Oil prices declined after US Gulf of Mexico crude production resumed following Hurricane Francine, and data indicated a weekly increase in the US rig count. Brent crude futures closed at $71.61 per barrel, a decrease of 36 cents, or 0.5%. US West Texas Intermediate (WTI) crude settled at $68.65 per barrel, down by 32 cents, or 0.5%. With production and refining activities on the US Gulf Coast restarting, investors chose to offload oil contracts ahead of the weekend. Bob Yawger, the director of energy futures at Mizuho in New York, explained that investors were cautious, suggesting that by Mo..

Next Story
Infrastructure Energy

Fadnavis: Farmers to Gain Income from Solar Pump Electricity Sales

Maharashtra’s Deputy Chief Minister, Devendra Fadnavis, announced that he would soon introduce a scheme allowing farmers to sell surplus electricity generated by their agricultural solar pump panels to the grid, thereby creating an additional income source for them. This announcement was made during the inauguration of an MSEDCL website intended for registering beneficiary farmers under the scheme. Additionally, Fadnavis released an informative booklet and poster outlining the details of the scheme. Fadnavis noted that before 2014, farmers faced significant challenges with delayed electric..

Hi There!

"Now get regular updates from CW Magazine on WhatsApp!

Join the CW WhatsApp channel for the latest news, industry events, expert insights, and project updates from the construction and infrastructure industry.

Click the link below to join"

+91 81086 03000