Goa Floats Rs. 270.4 mn PPP Tender for Panaji Port
PORTS & SHIPPING

Goa Floats Rs. 270.4 mn PPP Tender for Panaji Port

The Captain of Ports (CoP) Department of the Goa Government has invited bids for a Public-Private Partnership project estimated at Rs. 270.4 mn to operate and maintain the Captain of Ports Terminal Building in Panaji, manage a network of jetties and develop a yacht docking station. The concession will run for 30 years and may be extended by 10 years under a Leave and License model.

The selected operator will manage the terminal on Dayanand Bandodkar Marg, which covers approximately 3,205 sq. m. across its ground and upper floors. Facilities include commercial spaces, a rooftop restaurant with indoor and terrace dining, an open-air amphitheatre, a ground-floor cafeteria and three passenger ticketing counters. The building was constructed at a cost of Rs. 488.7 mn.

The concessionaire will also take over six existing facilities, including the CoP main and floating jetties in Panaji, the Ferry Ramp floating jetty, the Old Goa main and floating jetties and Betim jetty. Three additional floating jetties near Kala Academy, Mahaveer Garden and the Bhagwan Parshuram Statue will be transferred after commissioning.

Under the project, the private partner must finance, design, construct and operate a 200 m by 6 m concrete floating jetty and mini-terminal near Divja Circle within three years. The facility must accommodate at least 40 vessels, while three berthing slots will remain free for coastal police and government vessels. The concessionaire will pay an upfront fee of Rs. 12 mn and an annual licence fee, with the higher of that fee or 5 per cent of gross project revenue payable to the department.

Passenger charges will be capped at Rs. 25, with berthing fees limited to Rs. 30,000 per month, or Rs. 15,000 if central scheme funding is used. Casino-linked entities are barred from bidding. Security obligations include ISPS compliance, AI-enabled facial-recognition CCTV, continuous security and a utility workboat capable of at least 20 knots. Bids must be submitted online by October 23, 2026, with an earnest money deposit of Rs. 2 mn.

The Captain of Ports (CoP) Department of the Goa Government has invited bids for a Public-Private Partnership project estimated at Rs. 270.4 mn to operate and maintain the Captain of Ports Terminal Building in Panaji, manage a network of jetties and develop a yacht docking station. The concession will run for 30 years and may be extended by 10 years under a Leave and License model. The selected operator will manage the terminal on Dayanand Bandodkar Marg, which covers approximately 3,205 sq. m. across its ground and upper floors. Facilities include commercial spaces, a rooftop restaurant with indoor and terrace dining, an open-air amphitheatre, a ground-floor cafeteria and three passenger ticketing counters. The building was constructed at a cost of Rs. 488.7 mn. The concessionaire will also take over six existing facilities, including the CoP main and floating jetties in Panaji, the Ferry Ramp floating jetty, the Old Goa main and floating jetties and Betim jetty. Three additional floating jetties near Kala Academy, Mahaveer Garden and the Bhagwan Parshuram Statue will be transferred after commissioning. Under the project, the private partner must finance, design, construct and operate a 200 m by 6 m concrete floating jetty and mini-terminal near Divja Circle within three years. The facility must accommodate at least 40 vessels, while three berthing slots will remain free for coastal police and government vessels. The concessionaire will pay an upfront fee of Rs. 12 mn and an annual licence fee, with the higher of that fee or 5 per cent of gross project revenue payable to the department. Passenger charges will be capped at Rs. 25, with berthing fees limited to Rs. 30,000 per month, or Rs. 15,000 if central scheme funding is used. Casino-linked entities are barred from bidding. Security obligations include ISPS compliance, AI-enabled facial-recognition CCTV, continuous security and a utility workboat capable of at least 20 knots. Bids must be submitted online by October 23, 2026, with an earnest money deposit of Rs. 2 mn.

Related Stories

Gold Stories

Next Story
Resources

Kalpataru Projects International elevates Amit Uplenchwar as Joint MD and CEO

Kalpataru Projects International (KPIL) has elevated Amit Uplenchwar as Joint Managing Director and CEO (designate), following approval by its board on 5 November 2026. He will take charge as Additional Director, Joint Managing Director and CEO from 1 January 2027 for a five-year term ending 31 December 2031, subject to shareholders' approval.Uplenchwar brings over three decades of experience in corporate strategy, business operations, business development, mergers and acquisitions, and international business management. His experience spans transportation, power, water, oil and gas, aerospace..

Next Story
Resources

HCC appoints Vivek Singhal as CEO

Hindustan Construction Company (HCC) has appointed Vivek Singhal as Chief Executive Officer, effective 5 November 2026. He brings over four decades of experience in infrastructure and engineering, procurement and construction (EPC), covering project execution, business leadership, business development and profit and loss management.Singhal has spent 16 years in international markets, delivering projects and managing assets worth approximately Rs 285 billion across five countries. His experience spans airports, metro rail, urban transport, hydropower, bridges and other infrastructure sectors.He..

Next Story
Infrastructure Energy

Essar Signs PPA for 300 MW Hybrid Renewable Energy Project

Essar Renewables, the renewable energy arm of Essar Power, has signed a Power Purchase Agreement (PPA) with NHPC for a 300 MW renewable energy project in Andhra Pradesh. The agreement follows the company’s successful bid for the project two years ago. Essar Power will invest approximately Rs. 45 bn in the development. The project will combine solar and wind generation with Battery Energy Storage Systems (BESS), enabling the supply of reliable and dispatchable renewable power. It forms part of Essar Power’s plan to build a diversified energy portfolio of approximately 5 GW across renewable,..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code