Inox Neo Energies Wins Big at Wind Power Project Auction
POWER & RENEWABLE ENERGY

Inox Neo Energies Wins Big at Wind Power Project Auction

The Gujarat Urja Vikas Nigam Limited (GUVNL) Wind Phase-IX auction was held on 24th April with the aim of developing 250 MW of grid-connected wind power projects across Gujarat. 

After participating in auction, Inox Neo Energy, a subsidiary of Inox Clean Energy and the independent power producer arm of the INOXGFL Group, has now secured 50 MW out of its quoted 100 MW of power at a tariff of Rs 3.66/kWh. 

Kailash Tarachandani, the Group CEO of Renewables Business at INOXGFL Group heralded this grant saying, “This 50 MW marks a beginning to [Inox Neo Energies building a cleaner, greener future]”

The Gujarat Urja Vikas Nigam Limited (GUVNL) Wind Phase-IX auction was held on 24th April with the aim of developing 250 MW of grid-connected wind power projects across Gujarat. After participating in auction, Inox Neo Energy, a subsidiary of Inox Clean Energy and the independent power producer arm of the INOXGFL Group, has now secured 50 MW out of its quoted 100 MW of power at a tariff of Rs 3.66/kWh. Kailash Tarachandani, the Group CEO of Renewables Business at INOXGFL Group heralded this grant saying, “This 50 MW marks a beginning to [Inox Neo Energies building a cleaner, greener future]”

Related Stories

Gold Stories

Next Story
Real Estate

Adani begins construction of Dharavi rehabilitation homes

Construction of rehabilitation homes for eligible Dharavi residents has commenced at the 22-acre Matunga railway site, following a Bhoomi Poojan ceremony performed by Pranav Adani, Director, Adani Enterprises (AEL). The project, being implemented by Adani Navbharat Developers (ANDPL), envisages 10 towers comprising 10,432 rehabilitation apartments and 1,379 commercial and industrial units.Under the in-situ rehabilitation scheme, eligible residents will receive homes measuring 350 sq ft. Residents from Sectors 6 and 1 will be accommodated at Matunga first, followed by nearly 4,500 apartments fo..

Next Story
Real Estate

Adani begins construction of Dharavi rehabilitation homes

Construction of rehabilitation homes for eligible Dharavi residents has commenced at the 22-acre Matunga railway site, following a Bhoomi Poojan ceremony performed by Pranav Adani, Director, Adani Enterprises (AEL). The project, being implemented by Adani Navbharat Developers (ANDPL), envisages 10 towers comprising 10,432 rehabilitation apartments and 1,379 commercial and industrial units.Under the in-situ rehabilitation scheme, eligible residents will receive homes measuring 350 sq ft. Residents from Sectors 6 and 1 will be accommodated at Matunga first, followed by nearly 4,500 apartments fo..

Next Story
Equipment

Seven Propel 470 HEV electric tippers go to work on coal haulage in Chhattisgarh

Propel EV, the electric mobility division of Propel Industries and India's No. 1 electric tipper brand, has deployed seven 470 HEV electric trucks with a leading coal-haulage contractor at one of India's largest opencast coal mines in Chhattisgarh. The trucks are in daily operation, moving coal on continuous haul cycles in one of the most demanding applications in Indian mining.Why Electric - and Why CoalCoal haulage runs round the clock: heavy loads, long haul cycles, steep ramps and abrasive dust. It is also where diesel hurts most. Engines run continuously, fuel is the largest single operat..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code