Waaree Secures 412.5 MWp Solar EPC Contract in Rajasthan
POWER & RENEWABLE ENERGY

Waaree Secures 412.5 MWp Solar EPC Contract in Rajasthan

Waaree Renewable Technologies Ltd, a unit of Waaree Energies Ltd, has been awarded the Engineering, Procurement, and Construction (EPC) contract for a 412.5 MWp photovoltaic project in Rajasthan by Acciona Energy?s subsidiary Juna Renewable Energy Pvt Ltd.

The project, located in Kawani Village, Bikaner district, will utilize bifacial solar modules supplied by Waaree Energies, installed on horizontal single-axis trackers. The comprehensive EPC contract covers design engineering, procurement, construction, and commissioning, including the setup of a 33/220 kV plant substation and power transformers.

Viren Doshi, Executive Director of Waaree Renewable Technologies Ltd, commented, ?We believe that this project illustrates our capabilities in executing large-scale solar projects, from module supply to turnkey EPC solutions. With our engineering capabilities and track record, we believe that we are well-equipped to deliver this project efficiently, ensuring seamless integration of radical technologies and sustainable practices.?

In addition to EPC services, Waaree Renewable Technologies will provide automatic and semi-automatic module cleaning robots and spares, aiming to enhance energy yield and support India's renewable energy goals.

Waaree Renewable Technologies Ltd, a unit of Waaree Energies Ltd, has been awarded the Engineering, Procurement, and Construction (EPC) contract for a 412.5 MWp photovoltaic project in Rajasthan by Acciona Energy?s subsidiary Juna Renewable Energy Pvt Ltd. The project, located in Kawani Village, Bikaner district, will utilize bifacial solar modules supplied by Waaree Energies, installed on horizontal single-axis trackers. The comprehensive EPC contract covers design engineering, procurement, construction, and commissioning, including the setup of a 33/220 kV plant substation and power transformers. Viren Doshi, Executive Director of Waaree Renewable Technologies Ltd, commented, ?We believe that this project illustrates our capabilities in executing large-scale solar projects, from module supply to turnkey EPC solutions. With our engineering capabilities and track record, we believe that we are well-equipped to deliver this project efficiently, ensuring seamless integration of radical technologies and sustainable practices.? In addition to EPC services, Waaree Renewable Technologies will provide automatic and semi-automatic module cleaning robots and spares, aiming to enhance energy yield and support India's renewable energy goals.

Next Story
Infrastructure Urban

Canal Water Boost for Mudki

In a significant push for public health and urban development, MLA Rajneesh Dahiya has announced a Rs.280 million canal water supply project for Mudki town in the Ferozepur Rural constituency. The initiative aims to provide clean drinking water to every household within Mudki’s municipal limits. Speaking about the development, Dahiya said the project falls under the Centre’s AMRUT (Atal Mission for Rejuvenation and Urban Transformation) scheme and is being carried out with the support of Punjab Chief Minister Bhagwant Singh Mann and Local Government Minister Dr. Inderbir Nijjar. “This ..

Next Story
Infrastructure Transport

6 Tunnel Boring Machines Idle in Chennai

Six tunnel boring machines (TBMs) deployed by the Chennai Metro Rail Limited (CMRL) are currently lying idle beneath city roads, stuck in limbo due to delayed construction of underground stations at Moolakadai, Perambur, and Mandaveli. The TBMs, launched as part of Corridor 3 of the Phase II Metro project from Madhavaram to SIPCOT, have reached their designated stations but are unable to proceed as the station boxes are incomplete. Without a completed diaphragm wall or station box, the machines cannot break through or be dismantled for reuse. According to CMRL officials, the root of the dela..

Next Story
Infrastructure Transport

Mumbai Metro 3 Nears Launch

The Mumbai Metro Rail Corporation shared a sneak peek of the newly completed Acharya Atre Chowk station on Metro Line 3 (Aqua Line) this Sunday, drawing both praise and impatience from the public. Located on the 9.77 km stretch between Bandra Kurla Complex (BKC) and Worli, the underground station is part of a long-anticipated corridor that promises to ease traffic and boost east-west connectivity. The social media update, posted by the handle @MumbaiMetro3, featured images of the station’s sleek new interiors. But the post quickly sparked a flurry of comments, with several users demanding c..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?