Newaj River Viaduct: Above the River, Beyond the Ordinary
RAILWAYS & METRO RAIL

Newaj River Viaduct: Above the River, Beyond the Ordinary

Across the Newaj River’s sweeping terrain, 37 spans and towering piers are taking shape to carry a new railway corridor through Madhya Pradesh. With piers rising up to 40 m and composite girders forming the elevated structure, the project brings together precision engineering, spe...

Across the Newaj River’s sweeping terrain, 37 spans and towering piers are taking shape to carry a new railway corridor through Madhya Pradesh. With piers rising up to 40 m and composite girders forming the elevated structure, the project brings together precision engineering, specialised construction techniques and the challenges of building across a riverine landscape. Part of the Ramganjmandi–Bhopal new railway line, the Newaj River bridge-cum-viaduct is being executed by Rahee Infratech on the Rajgarh–Biyavra section for West Central Railway. Extending across the river and adjoining terrain, the structure forms a major elevated crossing on a corridor intended to improve regional rail connectivity.Courtesy: Rahee Infratech  The viaduct comprises 37 major spans of 30.5 m each, providing a cumulative nominal span length of 1,128.5 m. Its alignment carries the railway across the Newaj River and surrounding low-lying terrain, with closely spaced supports forming a continuous elevated passage through the landscape. Rising up to 40 m above ground level, the reinforced-concrete piers form the principal vertical supports of the viaduct. Their construction uses slip-form shuttering technology, enabling the formwork to advance progressively as concrete is placed. The method is suited to the repetitive, high-level pier construction required for this railway crossing. Courtesy: Rahee Infratech The Newaj River crossing presents a distinct construction challenge, with elevated spans carried across the watercourse and adjoining banks. Developing the structure requires the integration of high-level substructures and composite-girder superstructures, while accommodating varying ground levels along the railway alignment.Courtesy: Rahee InfratechRahee’s scope includes the fabrication, assembly and erection of composite girders for the viaduct’s 37 spans. Combining steel and concrete elements, the superstructure transfers railway loads to the supporting piers. The photographs reveal the girder arrangement and the elevated deck taking shape above the construction corridor.Courtesy: Rahee InfratechThe bridge-cum-viaduct is a key structure on the Rajgarh–Biyavra section of the Ramganjmandi–Bhopal new line. Its completion will remove a significant physical barrier along the alignment, supporting the corridor’s eventual role in improving passenger and freight connectivity across parts of Madhya Pradesh and Rajasthan.FACT FILE - Project: Newaj River Bridge-Cum-Viaduct - Location: Rajgarh–Biyavra section, Madhya Pradesh - Railway Project: Ramganjmandi–Bhopal New Rail Line - Railway Authority: West Central Railway - Executing Company: Rahee Infratech - Project Cost: Rs 191 crore - Structure: Railway bridge-cum-viaduct - Number of Spans: 37 - Span Length: 30.5 m each - Cumulative Nominal Span Length: 1,128.5 m - Construction Technology: Slip-form shuttering for high-level piers - Project Status: Under execution - Scheduled Completion: October 2026

Related Stories

Gold Stories

Next Story
Real Estate

IGBC Green Building Congress 2026 advances India’s net-zero agenda

The Indian Green Building Council (IGBC), part of the Confederation of Indian Industry (CII), opened the 24th edition of the Green Building Congress 2026 at the Jio World Convention Centre, Mumbai, with a focus on accelerating India's green and net-zero building movement. The three-day event, being held from 26 to 28 November, brought together policymakers, industry leaders and sustainability experts to discuss green buildings, climate-resilient infrastructure and sustainable communities.A key highlight of the inaugural session was the launch of five pilot rating systems: Green Retail, DigiBui..

Next Story
Real Estate

Maharashtra CM inaugurates fifth Model Sub-Registrar Office in Mumbai

Maharashtra Chief Minister Devendra Fadnavis has inaugurated a Model Sub-Registrar Office (SRO) in Lower Parel, Mumbai, taking the number of such centres launched in the state to five. The initiative aims to modernise property registration services through technology-enabled infrastructure and citizen-centric processes.Developed by the Government of Maharashtra in association with VFS Global and WE Excel Software, the Lower Parel centre follows the launch of Model SROs in Pune, Bandra Kurla Complex in Mumbai, Navi Mumbai and Nagpur.The centres provide facilities for registering property-relate..

Next Story
Infrastructure Transport

NHBF hails Indian Army aircraft operations on Amritsar–Jamnagar corridor

The National Highways Builders Federation (NHBF) has welcomed the successful landing and take-off of four Indian Army microlight aircraft on the Amritsar–Jamnagar Economic Corridor (NH-754K) in Gujarat. The exercise demonstrated the potential of highway infrastructure to support defence operations and emergency response. The expressway was developed by CDS Infra Projects, an NHBF member company.Developed under the Bharatmala Pariyojana, the six-lane greenfield corridor is described as India's second-longest expressway. The operation was conducted by the Indian Army's Team Mountain Eagles as ..

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code