GHHL installs flare with CC 8800-1
Equipment

GHHL installs flare with CC 8800-1

Gulf Haulage Heavy Lift (GHHL) used a Terex CC 8800-1 to install a flare stack at an oil facility for Saudi Aramaco in Yanbu, KSA. The stack was 200 m high and made up of structure segments weighing between 21 tonne and 104 tonne each.The project faced many challenges including high wind speeds. Every day at approximately 11:00 hours, winds would increase from a light breeze of 2 m per second to sustained gusts reaching 16 m per second, and this would sometimes continue all afternoon and evening.

Contact: Gulf Haulage Heavy Lift.
Tel: +966-13-811 8181.
Website: www.ghhl.net

Gulf Haulage Heavy Lift (GHHL) used a Terex CC 8800-1 to install a flare stack at an oil facility for Saudi Aramaco in Yanbu, KSA. The stack was 200 m high and made up of structure segments weighing between 21 tonne and 104 tonne each.The project faced many challenges including high wind speeds. Every day at approximately 11:00 hours, winds would increase from a light breeze of 2 m per second to sustained gusts reaching 16 m per second, and this would sometimes continue all afternoon and evening. Contact: Gulf Haulage Heavy Lift. Tel: +966-13-811 8181. Website: www.ghhl.net

Related Stories

Gold Stories

Hi There!

Now get regular updates from CW Magazine on WhatsApp!

Click on link below, message us with a simple hi, and SAVE our number

You will have subscribed to our Construction News on Whatsapp! Enjoy

+91 81086 03000

Join us Telegram