The Next-Gen Concrete Equipment
Equipment

The Next-Gen Concrete Equipment

India has transitioned to higher Bharat Stage (BS) emission standards across vehicle types. Concrete equipment is no exception, with the latest engines generation in that category being CEV Stage IV and V models. This shift has fundamentally transformed how this critical equipment is operated and maintained.

Fuel-efficiency

Upgrading to advanced BS-compliant engines has replaced older mechanical fuel systems with Electronic Control Units (ECUs) and Common Rail Direct Injection (CRDI). Rather than running at a constant high output, these new systems precisely meter fuel based on the immediate load demands of the pump or mixer drum, explains Abhik Ghosh, Manager QA/QC, Jyo Consultants...

To read the full article Click Here

India has transitioned to higher Bharat Stage (BS) emission standards across vehicle types. Concrete equipment is no exception, with the latest engines generation in that category being CEV Stage IV and V models. This shift has fundamentally transformed how this critical equipment is operated and maintained.Fuel-efficiencyUpgrading to advanced BS-compliant engines has replaced older mechanical fuel systems with Electronic Control Units (ECUs) and Common Rail Direct Injection (CRDI). Rather than running at a constant high output, these new systems precisely meter fuel based on the immediate load demands of the pump or mixer drum, explains Abhik Ghosh, Manager QA/QC, Jyo Consultants...To read the full article Click Here

Related Stories

Gold Stories

Next Story
Technology

Where Infrastructure Meets Intelligence: Inside Bentley's Year inc

Oct 28, 2026  @Tanveer PadodeA first-hand account of Bentley’s 2026 awards, where AI, digital twins and engineering innovation are reshaping infrastructure delivery.- By Tanveer Padode, CEO, IMPACCT: A first-hand account of Bentley’s 2026 awards, where AI, digital twins and engineering innovation are reshaping infrastructure delivery.Two days in SingaporeConstruction is won or lost in two places: how a project is designed and how it is delivered. Technology has promised to improve both for years, and the question I carried into Bentley's Year in Infrastructure, held at the Fairmont Si..

Next Story
Infrastructure Transport

Vaishnaw Inaugurates Two Rail Sections in Madhya Pradesh

Railway Minister Ashwini Vaishnaw on October 24 inaugurated the Satna-Devendranagar and Rewa-Churhat rail sections under the Lalitpur-Singrauli Railway Project in Madhya Pradesh. He also flagged off the new Devendranagar-Churhat passenger train service through video conferencing. Chief Minister Dr Mohan Yadav attended the event. The new Rewa-Churhat railway line, which extends approximately 65 km, was built at a cost of over Rs. 10 bn. The 53 km Satna-Devendranagar line was constructed at a cost of over Rs. 8 bn. The passenger service is expected to provide improved rail access to residents in..

Next Story
Infrastructure Transport

Railways Minister to Inaugurate New Rail Sections Covering 118 km

Railways Minister Ashwini Vaishnaw will inaugurate the Satna-Devendra Nagar and Rewa-Churhat rail sections in Madhya Pradesh on October 24. The two sections have a combined length of 118 km and are intended to improve passenger and freight connectivity across the region. Vaishnaw will also flag off a new train service between Devendra Nagar and Churhat. Madhya Pradesh Chief Minister Mohan Yadav will attend the inauguration programme, according to information released by the Ministry of Railways. The 53-km Satna-Devendra Nagar section is expected to improve rail access to Satna, Nagod, Devendra..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code