+
Enerpac Launches Safer Industrial Lifting Solutions in India
ECONOMY & POLICY

Enerpac Launches Safer Industrial Lifting Solutions in India

Enerpac has introduced its CR-Series Cribbing Ring Sets and TJP-Series 30-Ton Hydraulic Toe Jack in India, expanding its range of precision lifting solutions for manufacturing, infrastructure and energy applications.

The products are designed to improve safety, control and efficiency during heavy lifting, load holding and machine-moving operations.

The CR-Series Cribbing Ring Sets provide an engineered alternative to improvised cribbing methods such as wooden blocks and steel plates. Their interlocking design offers predictable and mechanically secured load support for applications including transformer installation, bridge bearing replacement and stage-lighting operations.

A detachable fork allows operators to position and rotate U-Rings and spacers without placing their hands close to the suspended load. The series is available in CR30, CR50 and CR100 variants, covering lifting capacities ranging from 30 to 150 tonnes.

Enerpac has also launched the TJP308 Hydraulic Toe Jack for lifting and moving heavy machinery such as CNC and VMC machines in confined areas with limited ground clearance.

Made from aluminium, the jack weighs 80 kg and offers a lifting capacity of 30 tonnes. It features a 200 mm stroke, an adjustable three-position tilting toe, foldable side legs and solid rubber wheels for easier movement across industrial floors.

The jack is operated through a remote hydraulic pump, allowing workers to maintain a safer and more ergonomic position during lifting operations.

Anindya Pal, Director, Enerpac India, said the products were developed for industrial environments involving heavy loads, restricted spaces and critical lifting requirements.

He added that the solutions provide precise and controlled force, helping operators complete demanding lifting tasks safely and efficiently.

Enerpac has introduced its CR-Series Cribbing Ring Sets and TJP-Series 30-Ton Hydraulic Toe Jack in India, expanding its range of precision lifting solutions for manufacturing, infrastructure and energy applications. The products are designed to improve safety, control and efficiency during heavy lifting, load holding and machine-moving operations. The CR-Series Cribbing Ring Sets provide an engineered alternative to improvised cribbing methods such as wooden blocks and steel plates. Their interlocking design offers predictable and mechanically secured load support for applications including transformer installation, bridge bearing replacement and stage-lighting operations. A detachable fork allows operators to position and rotate U-Rings and spacers without placing their hands close to the suspended load. The series is available in CR30, CR50 and CR100 variants, covering lifting capacities ranging from 30 to 150 tonnes. Enerpac has also launched the TJP308 Hydraulic Toe Jack for lifting and moving heavy machinery such as CNC and VMC machines in confined areas with limited ground clearance. Made from aluminium, the jack weighs 80 kg and offers a lifting capacity of 30 tonnes. It features a 200 mm stroke, an adjustable three-position tilting toe, foldable side legs and solid rubber wheels for easier movement across industrial floors. The jack is operated through a remote hydraulic pump, allowing workers to maintain a safer and more ergonomic position during lifting operations. Anindya Pal, Director, Enerpac India, said the products were developed for industrial environments involving heavy loads, restricted spaces and critical lifting requirements. He added that the solutions provide precise and controlled force, helping operators complete demanding lifting tasks safely and efficiently.

Related Stories

Gold Stories

Next Story
Infrastructure Transport

Mumbai-Ahmedabad Bullet Train’s Surat-Vapi Section Set for 2027

The first section of the Mumbai-Ahmedabad Bullet Train corridor, linking Surat and Vapi, is targeted to begin services in 2027. Construction is expected to be completed by December 2026, while Railway Minister Ashwini Vaishnaw has indicated that an inauguration could take place around the middle of 2027. The National High Speed Rail Corporation (NHSRCL) said the train being manufactured in India is expected to reach the tracks around April or May 2027. The train will undergo extensive testing before the section is opened for passenger services. The project began construction in 2021 and includ..

Next Story
Infrastructure Transport

Indian Railways Approves Four Projects Worth Rs. 7.36 bn Across Four States

Indian Railways has approved four projects with a combined value of Rs. 7.36 bn across Uttar Pradesh, Maharashtra, Andhra Pradesh and Gujarat. The programme covers train protection, signalling, electric traction supply and a road overbridge, with each project assigned to a different railway zone. In Uttar Pradesh, Rs. 2.52 bn has been approved to extend the Kavach 4.0 automatic train protection system across 607.7 km in the Lucknow Division of North Eastern Railway. The system monitors train movements and can apply the brakes if a driver fails to observe a signal or exceeds a safe speed. The w..

Next Story
Infrastructure Urban

Chandru Raheja Sells 1.49% Stake in Mindspace REIT for Rs. 5 bn

Billionaire Chandru Lachmandas Raheja has sold a 1.49 per cent holding in Mindspace Business Parks REIT for Rs. 5 bn through a bulk deal on the BSE. The transaction involved 9.9 mn units and was executed at an average price of Rs. 505 per unit, according to exchange data. Following the sale, units of Mindspace Business Parks REIT were trading 0.18 per cent lower at Rs. 504.05 on Tuesday. Exchange data did not identify the buyers involved in the transaction. Raheja is the chairman of real estate company K Raheja Corp. The sale involved 99,00,990 units, representing 1.49 per cent of the Mumbai-b..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code