Suryakumar Yadav Buys 2 Apartments for Rs 211.1 Million: Square Yards
Company News

Suryakumar Yadav Buys 2 Apartments for Rs 211.1 Million: Square Yards

Renowned Indian cricketer Suryakumar Yadav, along with wife Devisha Yadav, have recently acquired two residential apartments in Godrej Sky Terraces, located in Deonar, Mumbai, for a total value of Rs 211.1 million, according to property registration documents reviewed by Square Yards on the website of Inspector General of Registration (IGR). The transaction was registered March 2025.
 
Deonar is a residential locality in eastern Mumbai, situated near Chembur. It is a suburb located in eastern Mumbai and falls under the Mumbai Suburban district. It is served by the Chembur railway station on the Harbour Line and is connected by the Mumbai Monorail and major roads like the Eastern Express Highway and Sion-Panvel Expressway.
 
The apartments are located in Godrej Sky Terraces, a residential project developed by Godrej, spanning 1.05 acres and offering 3 BHK and 4 BHK configurations, as per RERA. According to the IGR property registration documents reviewed by Square Yards, Yadav has purchased two apartments on consecutive floors, with a total carpet area of 392.36 sq. m. and a total built-up area of 424.46 sq. m. The agreement also includes six designated car parking spaces. The transaction incurred a stamp duty of Rs 12.6 million and a registration fee of Rs 30,000.

Renowned Indian cricketer Suryakumar Yadav, along with wife Devisha Yadav, have recently acquired two residential apartments in Godrej Sky Terraces, located in Deonar, Mumbai, for a total value of Rs 211.1 million, according to property registration documents reviewed by Square Yards on the website of Inspector General of Registration (IGR). The transaction was registered March 2025. Deonar is a residential locality in eastern Mumbai, situated near Chembur. It is a suburb located in eastern Mumbai and falls under the Mumbai Suburban district. It is served by the Chembur railway station on the Harbour Line and is connected by the Mumbai Monorail and major roads like the Eastern Express Highway and Sion-Panvel Expressway. The apartments are located in Godrej Sky Terraces, a residential project developed by Godrej, spanning 1.05 acres and offering 3 BHK and 4 BHK configurations, as per RERA. According to the IGR property registration documents reviewed by Square Yards, Yadav has purchased two apartments on consecutive floors, with a total carpet area of 392.36 sq. m. and a total built-up area of 424.46 sq. m. The agreement also includes six designated car parking spaces. The transaction incurred a stamp duty of Rs 12.6 million and a registration fee of Rs 30,000.

Next Story
Infrastructure Energy

Adani Green Adds 113 MW At Khavda, Capacity Hits 16.6 GW

Adani Green Energy Limited (AGEL) announced that it has operationalised 112.5 megawatts (MW) of renewable power projects at Khavda in Gujarat, raising its total generation capacity to 16,598.6 MW.The company said in an exchange filing that its step-down subsidiary, Adani Renewable Energy Fifty Six Limited, has commissioned a solar project of 87.5 MW, while Adani Green Energy Twenty Five B Limited has operationalised a 25 MW hybrid project at the same site.Following the required regulatory clearances, the company began power generation on 30 September 2025.With these additions, AGEL’s total o..

Next Story
Infrastructure Energy

Centre Sets National Standards For Renewable Power Use

The Central Government, in consultation with the Bureau of Energy Efficiency (BEE), has issued a new notification establishing minimum renewable energy consumption standards for designated power users across India. This framework replaces the 2023 notification and aims to accelerate the adoption of green electricity among consumers nationwide.Titled the Renewable Consumption Obligation (RCO), the regulation mandates that designated consumers — including electricity distribution licensees, open access consumers, and captive power users — must ensure a specified share of their total electric..

Next Story
Infrastructure Energy

Tata Power Signs Rs 12 Billion PPA For 80 MW Green Project

Tata Power Company announced that its renewable arm, Tata Power Renewable Energy Limited (TPREL), has signed a Power Purchase Agreement (PPA) with Tata Power Mumbai Distribution for an 80 MW Firm and Dispatchable Renewable Energy (FDRE) project.The Rs 12 billion project will combine solar, wind, and battery storage systems to provide reliable renewable power during peak demand periods, strengthening grid stability and meeting the growing energy needs of Mumbai.Scheduled for completion within 24 months, the facility is expected to generate around 315 million units (MUs) of clean electricity ann..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?