Amaravati ORR Cost Estimate Cut to Rs. 304.91 bn
ROADS & HIGHWAYS

Amaravati ORR Cost Estimate Cut to Rs. 304.91 bn

Authorities in Andhra Pradesh have revised the design of the proposed 189.93-km six-lane Amaravati Outer Ring Road (ORR), reducing the number of interchanges from 19 to 17. The changes were made after the National Highways Authority of India (NHAI) directed officials to rationalise costs. The initial estimate of Rs. 384.5 bn has been reduced to Rs. 304.91 bn.

The access-controlled ORR is being developed around the Amaravati Capital Region and will permit entry and exit only through designated interchanges. It will intersect six national highways, state highways and district roads, requiring double trumpet, single trumpet and rotary interchanges to connect the surrounding road network.

As part of the redesign, service roads proposed on the outer side of the ORR were dropped. Service roads will now be provided only on the inner side. Authorities also shelved a proposed 17.5-km six-lane link road between Tenali and Kaja on the Chennai-Kolkata National Highway, leading to the removal of two interchanges planned at either end of that link.

The planned structures include double trumpet interchanges at Kanchikacherla, Duggiralapadu, Mailavaram, Agiripalli, Pottipadu, Chalivendrapalem, Narakodur and the Chennai-Kolkata National Highway near Pottur and Lingayapalem. Rotary interchanges are proposed near Ponnavaram, Adivinekkalam-Velvattama, Gannavaram-Puttagunta, Manikonda, Nandivelugu, Ananthavarappadu and Pulladigunta.

A single trumpet interchange is planned near Medikondur, connecting the Vinukonda-Guntur highway, while the final interchange will be a rotary structure near Balusupadu on the Sattenapalli-Amaravati State Highway. Officials said the interchanges would integrate the capital region with major highways and surrounding districts while preserving the ORR's high-speed, access-controlled character.

Authorities in Andhra Pradesh have revised the design of the proposed 189.93-km six-lane Amaravati Outer Ring Road (ORR), reducing the number of interchanges from 19 to 17. The changes were made after the National Highways Authority of India (NHAI) directed officials to rationalise costs. The initial estimate of Rs. 384.5 bn has been reduced to Rs. 304.91 bn. The access-controlled ORR is being developed around the Amaravati Capital Region and will permit entry and exit only through designated interchanges. It will intersect six national highways, state highways and district roads, requiring double trumpet, single trumpet and rotary interchanges to connect the surrounding road network. As part of the redesign, service roads proposed on the outer side of the ORR were dropped. Service roads will now be provided only on the inner side. Authorities also shelved a proposed 17.5-km six-lane link road between Tenali and Kaja on the Chennai-Kolkata National Highway, leading to the removal of two interchanges planned at either end of that link. The planned structures include double trumpet interchanges at Kanchikacherla, Duggiralapadu, Mailavaram, Agiripalli, Pottipadu, Chalivendrapalem, Narakodur and the Chennai-Kolkata National Highway near Pottur and Lingayapalem. Rotary interchanges are proposed near Ponnavaram, Adivinekkalam-Velvattama, Gannavaram-Puttagunta, Manikonda, Nandivelugu, Ananthavarappadu and Pulladigunta. A single trumpet interchange is planned near Medikondur, connecting the Vinukonda-Guntur highway, while the final interchange will be a rotary structure near Balusupadu on the Sattenapalli-Amaravati State Highway. Officials said the interchanges would integrate the capital region with major highways and surrounding districts while preserving the ORR's high-speed, access-controlled character.

Related Stories

Gold Stories

Next Story
Infrastructure Energy

Vedanta Eyes AI to Accelerate Mineral Exploration

Vedanta Group is exploring the use of artificial intelligence (AI) to significantly improve efficiency in mineral exploration, geological analysis and resource modelling. The company aims to reduce exploration processes that traditionally take three to four months to just six to seven days through AI-driven technologies.The proposed approach involves AI-led geological analysis and mineral block modelling to accelerate mineral resource assessment and support faster, more cost-efficient development of domestic mineral reserves. The initiative aligns with India's growing focus on critical mineral..

Next Story
Technology

NXP Launches Unified Robotics Platform for Physical AI

NXP Semiconductors has launched a unified robotics platform designed to accelerate the development and deployment of trusted physical artificial intelligence (AI) systems. Built on the company's neural axis architecture, the platform integrates AI processing, connectivity, motor control, security and energy management within a common hardware and software ecosystem.The platform combines an open-source, modular software development kit (SDK) with pre-validated reference designs, enabling developers to build robotic systems more efficiently. It supports development ranging from individual subsys..

Next Story
Technology

Hindalco Hosts 44th ICSOBA Aluminium Conference in Bengaluru

Hindalco Industries, the metals flagship of the Aditya Birla Group, is hosting the 44th International Conference and Exhibition of the International Committee for Study of Bauxite, Alumina and Aluminium (ICSOBA) in Bengaluru from 15 to 20 November 2026.The conference brings together global aluminium producers, technology providers, researchers and industry experts to discuss technological advancements, sustainability and emerging opportunities across the aluminium value chain.Featuring more than 160 technical papers, nine keynote presentations and four parallel technical streams, the event foc..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code